INSTALLATION
11)Fit log
4th Fender Post
12)Place log
13)Place log
INSTALLATION
14)Spread the bag of vermiculite on the exposed base brick.
Ember Bed |
Completed Log Set Installation
03-35 03-36
| Ember Bed |
|
Regency® P40 Direct Vent Gas Fireplace | 31 |