Regency P48-2 Installation, Optional Bay Door, Optional Bay Trim, Bay Louvers, Diagram

Models: P48-2

1 52
Download 52 pages 41.93 Kb
Page 35
Image 35
OPTIONAL BAY DOOR

INSTALLATION

OPTIONAL BAY DOOR

4) Reconnect the 2 spring hooks securing the

BAY LOUVERS

fl ush door.

The Bay louvers MUST be used
with the Bay glass option.

The optional Bay door is an overlay on the flush front. The standard fl ush door and glass must remain on the unit.

1)Unhook the 2 spring loaded hooks from the bottom of the fl ush door.

5)Slide the valve extension knobs onto the valve knobs.

Note: If any maintenance etc. must be done in the firebox, first remove the Bay louvers and door.

1)Install top louver by sliding the two bracket clips into the brackets located on top of the baydoor.Seebelow.Thefittedlouverleaves a small gap between faceplate bottom and louver top.

2)Hook the top of the bay door over the fl ush door fl ange and swing the bottom against the bottom fl ange of the fl ush door.

OPTIONAL BAY TRIM

Attach the supplied magnets each to the back of the top and bottom trim pieces, and attach trim to the top and bottom of Bay door. See diagrams 3 and 4.

Note: Top and bottom louvers and brackets are different.

2)Install bottom louver by sliding the two bracket clips into the brackets located underneath the bay door. Install bottom louverbyslidingthetwobracketclipsintothe brackets located underneath the bay door and secure with 1 screw on each end.

3)Secure to the fl ush door bottom bracket with 2 screws provided.

Diagram 3

3) Open the bottom louver. Pull the Burner ON/OFF control box from inside the bottom of the fi replace. Using the 2 screws on the louver, secure the control box in place.

Burner

ON/OFF

Screwscontrol box on louver

bracket

Diagram 4

Regency® P48-2 Zero Clearance Direct Vent Gas Fireplace

35

Page 35
Image 35
Regency P48-2 Installation, Optional Bay Door, Optional Bay Trim, Bay Louvers, The Bay louvers MUSTbe used, Diagram