Regency P48-LP Optional Bay Door, Bay Louvers, Optional Bay Trim, The Bay louvers MUSTbe used

Models: P48-NG P48-LP

1 48
Download 48 pages 12.3 Kb
Page 29
Image 29
OPTIONAL BAY DOOR

INSTALLATION

OPTIONAL BAY DOOR

The Bay louvers MUST be used

with the Bay glass option.

The optional Bay door is an overlay on the flush front. The standard flush door and glass must remain on the unit.

1)Unhook the 2 spring loaded hooks from the bottom of the flush door.

4)Reconnect the 2 spring hooks securing the flush door.

5)Slide the valve extension knobs onto the valve knobs.

Note: If any maintenance etc. must be done in the firebox, first remove the Bay louvers and door.

BAY LOUVERS

1)Install top louver by sliding the two bracket clips into the brackets located on top of the bay door. See below. The fitted louver leaves a small gap between faceplate bottom and louver top.

2)Hook the top of the bay door over the flush door flange and swing the bottom against the bottom flange of the flush door.

Optional Bay Trim

Attach the supplied magnets each to the back of the top and bottom trim pieces, and attach trim to the top and bottom of Bay door. See diagrams 3 and 4.

Note: Top and bottom louvers and brackets are different.

2)Install bottom louver by sliding the two bracket clips into the brackets located un- derneath the bay door. Install bottom louver by sliding the two bracket clips into the brackets located underneath the bay door and secure with 1 screw on each end.

3)Secure to the flush door bottom bracket with 2 screws provided.

Diagram 3

3) Open the bottom louver. Pull the Burner ON/ OFF control box from inside the bottom of the fireplace. Using the 2 screws on the louver, secure the control box in place.

 

Burner

Screws
ON/OFF
control
on louver

box

bracket

 

Diagram 4

Regency P48 Zero Clearance Direct Vent Gas Fireplace

29

Page 29
Image 29
Regency P48-LP Optional Bay Door, Bay Louvers, Optional Bay Trim, The Bay louvers MUSTbe used, with the Bay glass option