8)Lower the door frame gently into place.

INSTALLATION

7)Install the door frame by hooking the top flange over the top of the glass door.

8)Lower the door frame gently into place.

9)Run supplied 120V power cord along front face of masonry fireplace and plug into nearest receptacle.

10)Slide unit into final position.

Completed Faceplate & Door Frame Installation

20

U32S-5 FPI Direct Vent Gas Insert

Page 20
Image 20
Regency U32S-NG5, U32S-LP5 Completed Faceplate & Door Frame Installation, 8Lower the door frame gently into place