Regency Wraps P36-LPG4 Mantel Leg Clearances, Framing And Finishing, Standard Framing Dimensions

Models: P36-NG4 P36-LPG4

1 44
Download 44 pages 50.27 Kb
Page 8
Image 8
MANTEL LEG

INSTALLATION

MANTEL LEG

CLEARANCES

Combustible mantel leg clearances as per diagram below:

P36

152m m Side W all

 

 

 

 

 

 

 

Fireplace

 

 

 

 

Maximum

Mantelleg

Mantelleg

38mm

m

38mm

 

 

 

76m

projection

51m m

 

 

at 51mm

 

 

 

 

minimum

127m m

 

 

 

clearance.

 

 

 

Allowable m antelleg

 

 

 

 

 

 

projection.

 

 

 

2)Frame in the enclosure for the unit with framing material.

FRAMING AND

FINISHING

1)Determine the total thickness of facing material (e.g. drywall plus ceramic tiles) to allow the fi nished surface to be fl ush with the front of the unit. Total facing thickness can vary from 1/2" (13mm) to 1-1/4" (32mm) thick.

Install Side Nailing Strips, Top Facing Support, and Top Standoffs before unit is slipped into position. See "Unit Assembly Prior to Installation" section for assembly details.

NOTE:

When using the Premium Flush Front option, a finishing trim (962mm cover) needs to be installed to cover the spacers.

Maintain a physical gap between lining and spacers 2-5mm. (5mm clearance to framing each side).

Standard Framing Dimensions

A

B

C

D

36-1/4" 36-1/4" 12-3/4" 46"*

921mm 921mm 324mm 1126mm*

Framing Dimensions with

Premium Flush Front Option

A

B

C

D

 

37-1/4"

37-1/4"

17-3/8"

46-1/2"*

 

944mm

946mm

432mm

1182mm*

 

 

 

 

 

* 'D' is Minimum height to combustible mate-

rials including the Minimum 2" (51mm) Top clearance to the Horizontal Flue, see fl ue clearances in section "Clearances."

3)For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fireplace itself.)

4)The top of the unit must not be closer than 32" (813mm) to the ceiling.

Note: 40-1/2" (1029mm) is the minimum height for both flex termination or Simpson Dura-Vent flueing.

Note: The unit does not have to be completely enclosed in a chase. The clearance on top of the unit is 0" to thestandoffssocombustiblebuilding materials can be laid directly on top of the standoffs. You must maintain 1-1/2" (38mm) clearance from the flue to combustible materials for flex (1-1/4" for Simpson Dura-Vent ).

5)Use steel studs for framing where the

1-1/2" (38mm) clearance from the fl ue to combustible material cannot be maintained, e.g. front top header.

Premium Flush Front Framing

Do not use combustible material as lining (eg. timber) around the fi replace as shown in the shaded area in the diagram below.

8

Regency® P36-4 Gas Log Fireplace

Page 8
Image 8
Regency Wraps P36-LPG4 Mantel Leg Clearances, Framing And Finishing, Standard Framing Dimensions, Framing Dimensions with