REMINGTON QFP40 Direct Vent FIREPLACE
VERTICAL INSTALLATION INSTRUCTIONS (CONT.)
CATHEDRAL CEILING INSTALLATION
Step 1. Follow installation Steps 1 and 2 under vertical termination section.
Step 2. Using the
Step 3. Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8" (3mm) larger than the support box outline.
Step 4. Lower the support box through the hole in the roof until the bottom of the box protrudes at least 2" (51mm) below the ceiling (Figure 17). Align the support box both vertically and horizontally with a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.
FIG. 17
Step 5. Using tin snips, cut the support box from the top corners down to the roofline, and fold the resulting flaps over the roof sheathing (Figure 18). Before nailing it to the roof, run a bead of
FIG. 18
Step 6. Complete the cathedral ceiling installation by following the same procedures outlines in steps 4 through 8 for vertical terminations.
VENTING
Page 41