Rinnai IB35ETRN, IB35ETRLC Installation / Commissioning Checklist, Installer Details, No Yes

Models: IB35ETRN IB35ETRLC

1 32
Download 32 pages 19.04 Kb
Page 31
Image 31
INSTALLATION / COMMISSIONING CHECKLIST

INSTALLATION / COMMISSIONING CHECKLIST

NO YES

1. Was a fireplace inspection carried out? (i.e. clearances, combustibles etc.)

2. Was a manufactured flue system installed?

3. Has specified gas pressure been set?

4. Are decorative logs located correctly on pins?

5.Have ember granules been placed and free of dust and powder?

6. Has appliance been sealed around the fireplace?

7. Has the appliance been test fired for correct operation (All burners light without delay)

8. Is the end-user fully aware of operating procedure?

INSTALLER DETAILS

Company name:

_______________________________________________________

Installers name:

______________________________________________________

Address:

______________________________________________________

 

______________________________________________________

Phone:

__________________

Mobile:

___________________

Permit number for installation:_________________

 

Signed: __________________________

Date:

___________________

31

Page 31
Image 31
Rinnai IB35ETRN, IB35ETRLC installation manual Installation / Commissioning Checklist, Installer Details, No Yes