1.

2.

Frame Assembly

Before beginning assembly, make sure you understand the information in the box on

page 5. Refer to the PART IDENTIFICATION CHART in the center of this manual for help identifying small parts.

Insert four M8 x 75mm Carriage Bolts (84) up through the Right Base (1). Note: It may be helpful to place a piece of tape over the bolt heads to hold them in place.

Insert four M8 x 75mm Carriage Bolts (84) up through the Left Base (2). Note: It may be help- ful to place a piece of tape over the bolt heads to hold them in place.

1

84

84

2

2

84

84

3.

Insert two M8 x 75mm Carriage Bolts (84) up

3

 

 

through the Rear Base (3). Note: It may be help

 

 

 

ful to place a piece of tape over the bolt heads

 

 

to hold them in place.

 

 

 

84

4. Attach the Rear Base (3) and the Left Base (2) to

4

 

the Right Base (1) with two M8 x 83mm Bolts (89)

 

3

89

and two M8 Nylon Locknuts (115). Do not tight-

 

 

en the Locknuta yet.

115

115

2

6

Page 6
Image 6
Sears 831.15403 user manual Frame Assembly, 115