Cable Assembly
22. Refer to the CABLE DIAGRAMS on pages 27
and 28 as you assemble the cables and to
identify the cables.
Locate the Lat Cable (71).Route theCable up
through the Right Top Frame (7)and overa
90mm Pulley (39). Make sure the Cable is
between the Pulley and the rodin the Top
Frame. Attach the Pulleyinsidethe TopFrame
withan M10 x80mm Bolt(111), two M10
Washers (116), two 19mm Spacers (77), and an
M10 NylonLocknut (114).
23. Routethe LatCable (71) over a 90ramPulley
(39) and down through the Right Top Frame (7).
Make sure the Cable is between the Pulley
and the rod in the Top Frame. Attach the Pulley
insidethe Top Framewith an M10 x 80mm Bolt
(111),two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut(114).
24. Wrap the LatCable (71) under a 90mm Pulley
(39). Attach the Pulley,a Small Cable Trap(48),
andtwo Half Finger Guards (42) at the second
holefrom the top of the two PulleyPlates (51)
withan M10 x 52mm Bolt(102) andan M10
NylonLocknut (114). Make sure the Cable Trap
and Finger Guards are oriented as shown.
25. Routethe LatCable (71) up throughthe Right
TopFrame (7)and overa 90mmPulley (39).
Make sure the Cable is between the Pulley
and the rod in the Top Frame. Attach the Pulley
insidethe Top Frame withan M10 x 80mm Bolt
(111),two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut(114).
26. Wrapthe Lat Cable (71) around a 115mm Pulley
(41).Attach the Pulleyand a LargeCable Trap
(125) to the RightTop Frame (7) with an M10 x
110ramBolt (73) and an M10 NylonLocknut
(114).
__-_2". 77 116
23 116 39 1_-_- _
24
71
51-
25 _71
7
114
114
73
125
13