Recommended Piping for Circulation Systems

NOTE:

For residential and commercial applications, this piping arrange- ment maintains full warranty.

Water Heater

For this application:

Equipment List

QTY

Water Heaters

1

Plumbing Installation

1

Kit (Optional)

(3/4" Fittings Include:

2 Unions, 2 Ball Valves,

2 Drain Valves and

1 Pressure Relief Valve.)

Pump should be controlled by an Aqua- stat, Timer or Combination Aquastat and Timer.

Pump to be sized to maintain circulation loop temperature.

The pump should be sized to overcome the pressure loss through the tank water heater, and supply and return plumbing.

Pump to be of bronze or stainless construction.

3/4" Gas Connection

Gas Supply

Minimum 3/4" Cold Water Supply Line

IMPORTANT: Connect the building return line to the hot water supply line as close as possible to the water heater.

Tank Water Heater to be Sized for Heat Loss of Circulation Loop.

Electric Water

Heater

Building Supply

Building

Fixtures

Expansion Tank

 

KEY

3/4" Ball Valve

Pressure Regulator

 

3/4" Union

Circulating Pump

Check Valve

Boiler Drain Valve

Pressure Relief Valve

S Solenoid Valve

This is not an engineered drawing. It is intended only as a guide and not as a replacement for professionally engineered project drawings. This drawing is not intended to describe a complete system. It is up to the contractor/engineer to determine the necessary components and configuration of the particular system being installed. This drawing does not imply compliance with local building code requirements. It is the responsibility of the contractor/engineer to ensure installation is in accordance with all local building codes. Confer with local building officials before installation.

20

305, 505, 705 Indoor Manual

Page 20
Image 20
State Industries U287-084, 705 Series 200 Recommended Piping for Circulation Systems, For this application