4-2 Removing the Shear Plate (“DD dosing Module)
Removing the shear | Figure |
1.Turn “Off” off the “On/Off” switch.
2.Disconnect the power supply.
3.Open the toggle latches on the dosing motor.
4.Remove the dosing unit from the dosing motor.
5.Empty the dosing station.
6.Open the profile clamp (B) on the dosing hopper.
7.Remove the dosing hopper from the dosing feeder.
8.Loosen the two screws (C) on the underside of the dosing unit housing (E).
9.Remove the shear (A).
Installing the shear
1.Place the new shear in the dosing unit housing, and ensure that it is positioned correctly.
2.Bolt the shear in place with the two (2) hexagon M5 x 16 socket screws and lock washers.
3.Turn the dosing disc to verify smooth rotation. Replace shear if it is dragging on disc when disc is rotated.
4.Position the dosing hopper on the dosing module, and install the profile clamp (B).
5.Tighten the M10 hex head screw on the profile clamp.
6.Position the dosing unit on the dosing motor, aligning the guide pins.
7.Close the toggle latches, fastening the dosing module to the motor assembly.
882.01749.00 | 70 of 93 |