5

Startup Checklists

 

 

5-1 Introduction

Important!

These lists assume the installation information in this manual has been read and followed.

Have new chillers started up and checked by a qualified refrigeration service technician.

Sterling offers factory startup for SCW Series chilling stations.

Call the Sterling Service Department at 1 (800) 233-4819 for more details.

5-2 Water-Cooled SCW Series Startup Checklist

;Check the shipping papers against the serial tag to be sure chiller size, type and voltage is correct for the process.

;Check the transformer primary voltage connections to be sure they are configured for the electrical power you are using.

;The voltage at the main power connection must be within plus or minus ten percent (±10%) of the voltage listed on the serial tag.

;Phase imbalance must be less than two percent (<2%).

;Electrical connections must conform to all applicable codes.

;Complete the chilled water TO PROCESS and FROM PROCESS connections.

;The optional or field installed chilled water supply and return valves on the chiller must be open.

;Be sure the pump tank and chilled water circuit are filled with a water/glycol mixture that provides freeze protection to 20°F (12ºC) below the leaving water temperature you want.

;Complete the tower or city condenser WATER IN and WATER OUT connections. Provide an adequate condenser water supply; 2 gpm per ton for city water or 3 gpm per ton for tower water operation.

;Remove all tools, foreign matter and debris from the pump tank reservoir and piping.