Sterling SDAA 25-100 specifications Table of Contents

Models: SDAA 25-100

1 60
Download 60 pages 53.38 Kb
Page 3
Image 3

Table of Contents

CHAPTER 1: SAFETY

V

1-1 How to Use This Manual

v

 

Safety Symbols Used in this Manual

v

1-2

Warnings and Precautions

vi

1-3

Responsibility

vii

 

General Responsibility

vii

 

Operator Responsibility

viii

 

Maintenance Responsibility

ix

 

Reporting a Safety Defect

ix

CHAPTER 2: FUNCTIONAL DESCRIPTION

11

2-1 Models Covered in This Manual

11

2-2

General Description

11

 

What is desiccant?

12

 

The Process/Regeneration Cycle

12

2-3

Standard Features

12

 

Mechanical Features

12

 

Electrical Features

12

 

Controller Features

13

2-4

Options

13

2-5 Safety Devices and Interlocks

13

CHAPTER 3: INSTALLATION

15

3-1

Uncrating the Equipment

15

3-2 Rigging and Placing the Dryer

15

 

Recommended Dryer Lifting Hardware

18

3-3

Electrical Connections

19

3-4

Setup Procedures

20

 

Checking for Proper Blower Rotation

20

 

Making Dryer/Drying Hopper Process Air Connections

20

 

Drying Hopper Air Trap Considerations

21

 

Optional Aftercooler

21

3-5

Initial Start-up

22

 

Pre-Startup Checks

22

 

Starting Up the Dryer

22

 

Auto-Tuning the Dryer

22

 

Shutting Down the Dryer

23

CHAPTER 4: OPERATION

24

4-1

Start-up

24

4-2 Controller Description and Operation

25

 

Identifying Control Panel Indicator Lights and Switches for the Standard

 

 

Controller

25

 

Process Air Temperature Controller

26

 

Setting the Process Air Temperature

27

Dehumidifying Dryers

ii

Page 3
Image 3
Sterling SDAA 25-100 specifications Table of Contents