Chapter 3: Installation
3-1 Uncrating the Equipment
Dehumidifying Dryers are shipped mounted on a skid, enclosed in a plastic wrapper, and contained in a cardboard box.
1. Pry the crating away from the skid.
Note: Remove the nails holding the box to the skid and lift the box off carefully; avoiding staples in the 1’ x 4’ wood supports. Cut the steel banding.
2.Use a pry bar to remove the blocks securing the unit to the skid.
3.Lift unit from sides. Use a pry bar if necessary to carefully remove the skid from the unit.
4.Lower slowly.
3-2 Rigging and Placing the Dryer
Take care when rigging and placing the dryer. Figures 1, 2 and 3 on the following pages show a suggested safe rigging diagram. It lets you lift the dryer/hopper unit vertically for installation on the machine throat. Adjust chain lengths at the center sling bracket before you lift the unit. Your dryer has
Caution! If you are mounting a
Be aware that
For 60 cfm dryer units, you must provide additional support to stabilize these units and to protect personnel when installing on machine throats.
Use caution and observe safety rules when lifting and placing your dryer!