Sterling SDAA 25-100 specifications Model Heating Cooling 15 cfm 30 cfm 60 cfm

Models: SDAA 25-100

1 60
Download 60 pages 53.38 Kb
Page 36
Image 36

3.Once the control power is on and no fault conditions exist, turning the OFF-ON- START switch to the START position will start the dryer as follows:

a.The process heater is turned on and controlled by the E5CN controller.

b.The process/regen blower is started.

c.The regen heater is turned on and the regeneration timing sequence is initiated. The regen heater is controlled by the E5C2 controller. For default timing settings for regeneration, see the table below.

Model

Heating

Cooling

15 cfm

35

30

30 cfm

 

 

60 cfm

35

30

Note: In a humid environment, you may change the setting to 40 / 25 for better results.

4.If either the left or right bed safety temperature switch opens, a regen heater fault is generated. “HIGH TEMP” is displayed on the relay screen. The alarm light is activated. The process heater, regen heater, and process/regen blower are turned off.

Turn the Off-On-Start switch to the START position to deactivate the alarm light and restart the dryer. If the switch is still open, the dryer will not restart.

5.If the OMRON controller faults, the optional redundant high temperature safety device opens, or the process heater safety switch opens, a heater fault is generated. “HIGH TEMP” is displayed on the relay screen. The alarm light is activated. The process heater, regen heater, and process/regen blower are turned off.

Turn the OFF-ON-START switch to the START position to deactivate the alarm light and restart the dryer. If the fault condition still exists, the dryer will not restart.

6.If the process blower overload trips, a process blower fault is generated. “PROC BLWR” is displayed on the relay screen. The alarm light is activated. The process heater, regen heater, and process/regen blower are turned off.

Reset the motor overload and turn the Off-On-Start switch to the START position to deactivate the alarm light and restart the dryer.

7.The valve position limit switch enables the right bed heater and provides an input signal to the programmable relay when actuated by the cam lobe. When the cam lobe position is high, the right bed is activated. When the cam lobe position is low, the left bed is activated. Each heater is ON-OFF controlled by the OMRON E5C2 controller.

8.Upon completion of the HEAT portion of the regeneration sequence, the regen heaters are disabled by the programmable relay and the COOL time begins.

9.Once the Cool time has expired, the valve motor is turned on until the cam switch makes a transition. Upon making a transition, the timing sequence is restarted for the new bed.

10.When no fault conditions exist, the display reads “SYSTEM NORMAL”.

Dehumidifying Dryers

Chapter 4: Operation

35 of 59

Page 36
Image 36
Sterling SDAA 25-100 specifications Model Heating Cooling 15 cfm 30 cfm 60 cfm