FIGURE 1-7Inserting the AMC Into a Blade Server

8.Push the ejector latch in fully.

If system power is on and AMC is installed properly, the AMC board Hot-Swap LED lights up. The Hot-Swap LED blinks for several seconds, then goes off.

If the Hot-Swap LED does not go off after several seconds, push firmly on the injector/ejector handles to ensure that they are pushed in all the way.

Chapter 1 Getting Started 1-17

Page 27
Image 27
Sun Microsystems CP3000 manual Push the ejector latch in fully, 7Inserting the AMC Into a Blade Server