APPENDIX TROUBLESHOOTING

Loading Preset Banks

The P2 is loaded with the 8 presets from the Default F1 bank (see page 37). These are the presets accessible from the Front Panel . However, it is possible to load other banks into the front panel. To do this:

Press and hold LOCK when powering up. All key LEDs will flash.

Press the key equivalent to the bank you wish to load to the front panel.

Now the LEDs in the LOCK and BYPASS keys will flash.

Press LOCK (green LED) to proceed/confirm loading the selected bank or press BYPASS (red LED) to decline/exit the bank load mode.

Notes

Reboot the TC Icon PC Editor between connecting different P2 units.

Port Conflict

Another active application may conflict with the serial ports you have selected on the: Setup - Devices - Ports page.

If this is the case the following screen will appear.

There are two options to resolve this problem:

1Connect the P2 to another physical COM port and select this COMport an the COM port page.

2Close the conflicting application.

34

Page 36
Image 36
TC electronic SDN BHD P2 manual Appendix Troubleshooting, Loading Preset Banks, Port Conflict