Performance Verification
MTG100 & MTG300 MPEG Generator Service Manual 4Ć3
Procedures
The following conventions are used in the performance verification procedures:
Each test lists the characteristic that is being tested and the equipment
required to perform the test.
Each test contains complete setup instructions, which allows you to perform
each test individually or in order.
The equipment connection illustrations are specific to the recommended
equipment (equipment nomenclature is labeled). If you are using substitute
equipment, the location of your signal connections may vary from those in
the illustrations.
. Before you perform the performance verification procedures, be sure that
the MPEG generator is operating in an environment that is within the operating
limits described in Table 1-5 on page 1-10.
In addition, the MPEG generator and the test equipment must be warmed up for
at least 20 minutes to ensure accurate test results.
The performance verification procedures appear in the following order:
1. Internal clock frequency
2. ASI output
3. SSI output
4. Parallel output
5. Serial output
6. External clock input
7. External reference input