Teledyne 633 Slide the tape under the optical head, There may be some slack in the tape

Models: 633

1 75
Download 75 pages 27.1 Kb
Page 35
Image 35
Slide the tape under the optical head,

Teledyne Advanced Pollution Instrumentation

Model 633 Aethalometer® Black Carbon Monitor User Manual

Insert the new tape roll on the left side of the chamber and run the tape under the left guide‐arm.

Slide the tape under the optical head,

then run it under the right guide‐arm and install the empty roll on the right.

There may be some slack in the tape.

07645A DCN6170

33

Page 35
Image 35
Teledyne 633 user manual Slide the tape under the optical head, There may be some slack in the tape, 07645A DCN6170