Thermal insulation process

Under Ceiling Type

Installation Manual

Thermal insulation process

Apply thermal insulation for the pipes separately at liquid side and gas side.

For the thermal insulation to the pipes at gas side, be sure to use the material with heat-resisting temperature 248 °F (120 °C) or higher.

Using the attached thermal insulation material, apply the thermal insulation to the pipe connecting section of the indoor unit securely without gap.

REQUIREMENT

Apply the thermal insulation to the pipe connecting section of the indoor unit securely up to the root without exposure of the pipe. (The pipe exposed to the outside causes water leak.)

Wrap heat insulator with its slits facing up (ceiling side).

Wrap the pipe with the attached heat insulator without any gap between the indoor unit.

Indoor unit

The seam must be faced upward (ceiling side).

Heat insulation

Flare nut

Heat insulator

Union

of the pipe

pipe

 

(Accessory)

 

 

13-EN

– 13 –

Page 14
Image 14
Toshiba RAV-SP360CT-UL, RAV-SP420CT-UL, RAV-SP300CT-UL Thermal insulation process, Under Ceiling Type, Requirement