5 DRAIN PIPING WORK

Under Ceiling Type

Installation Manual

5 DRAIN PIPING WORK

„Piping/Heat insulating material CAUTION

Following the Installation Manual, perform the drain piping work so that water is properly drained, and apply a heat insulation so as not to cause a dew dropping.

Inappropriate piping work may result in water leakage in the room and wet of furniture.

„Piping/Heat insulating material

Require the following materials for piping and heat insulating at site.

Piping

Hard vinyl chloride pipe VP20

(Outer dia.: Ø1.0” (26 mm))

 

 

 

Heat insulator

Foam polyethylene:

Thickness 0.4” (10 mm) or more

 

REQUIREMENT

Be sure to perform heat insulation of the drain pipes of the indoor unit.

Never forget to perform heat insulation of the connecting part with the indoor unit.

An incomplete heat insulation causes dew dropping.

Set the drain pipe with downward slope (1/100 or more), and do not make swelling or trap on the piping. It may cause an abnormal sound.

For length of the traversing drain pipe, restrict 65’7” (20 m) or less.

In case of a long pipe, provide support brackets with interval of 4’11” - 6’7” (1.5 - 2 m) in order to prevent waving.

4’11” - 6’7” (1.5 - 2 m)

Support

 

bracket

1/100 or more

 

downward

 

Thermal insulator

 

Arched shape

NO

 

GOOD

Trap

 

Set the collective piping as shown in the below figure.

As long as possible (3.9” (100 mm))

VP20 VP20 VP20

 

 

Extended

 

 

ventilating

VP30 or more

Downward slope

pipe

 

1/100 or more

 

<Collective piping>

Be sure not to apply force to the connecting part of the drain pipe.

The hard vinyl-chloride pipe cannot be directly connected to the drain pipe connecting port of the indoor unit.

For connection with the drain pipe connecting port, be sure to use/fix the attached flexible hose with the hose band, otherwise a damage or water leak is caused on the drain pipe connecting port.

Drain pipe connecting

 

 

Attached flexible hose

 

port (Hard socket)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attached hose band

 

 

Attached hose band

 

 

 

 

 

 

 

 

Drain pan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Soft socket

 

 

Soft socket

 

 

 

 

 

 

 

 

 

 

 

Adhesive agent

 

 

 

 

 

 

 

 

VP20 vinyl chloride pipe

prohibited

 

 

 

(procured locally)

 

 

 

 

 

 

 

 

 

Adhesive inhibited:

Use the attached flexible hose and hose band for connecting the drain hose to the clear drain socket. If applying the adhesive, socket will be damaged and cause water leakage.

„Drain up

When not securing down slope on the drain pipe, use a Drain pump kit sold separately.

Also refer to the “Drain pump kit installation manual”. The drain pipe can be raised 23.6” (600 mm) from the top face of the main unit.

*When using Drain pump kit, both drain pipe and refrigerant pipe can be taken only from upper side.

*VP25 PVC pipe is needed when a drain pump is used.