Vermont Casting SDDVRBD, SDDVRC, SDDVRCCB Stardance Direct Vent - Rear Vent Gas Heaters, 20012950

Models: SDDVRMB SDDVRBD, SDDVRC, SDDVRCCB SDDVRCB SDDVRCBS SDDVRCVG SDDVRCH SDDVRCB, SDDVREB, SDDVRMB, SDDVRBS, SDDVRCH, SDDVRVG, SDDVRBD, SDDVRCCB, SDDVRCH, SDDVRCVG, SDDVRCBD SDDVREB SDDVRCMB SDDVRVG SDDVRBS SDDVRCBD SDDVRCEB SDDVRCCH

1 52
Download 52 pages 34.35 Kb
Page 26
Image 26

Stardance Direct Vent - Rear Vent Gas Heaters

Vertical Termination

Storm Collar

Approved Silicone

Sealant Here

Flashing

Offset Support

Collar

Firestop

Spacer

screws through the support collar and the outer wall of the pipe.

NOTE: If the cathedral ceiling support box assembly is being used, it may be necessary to temporarily connect the assembled pipe to the appliance. Determine and mark the location of where the support collar will be at- tached to the pipe. Disconnect and remove assembled pipe. Attach the support collar per Step 10 (where marked) and reinstall assembly. This is due to limited space within the cathedral ceiling support box. Install any required offset supports.

11.Add lengths of pipe and firestop as necessary until assembly extends to a point above the roof which complies with local code requirements for minimum ter- mination height and with the appliance manufacturer’s installation instructions. (Fig. 47)

Ceiling

 

Support

Ceiling Support Collar

Plate

 

 

Minimum

Roof Pitch

Height

Flat to 7/12

1’0”

Over 7/12 to 8/12

1’6”

Over 8/12 to 8/12

2’0”

Over 9/12 to 10/12

2’6”

Over 10/12 to 11/12

3’3”

Over 11/12 to 12/12

4’0”

Over 12/12 to 14/12

5’0”

Over 14/12 to 16/12

6’0”

Over 16/12 to 18/12

7’0”

Over 18/12 to 20/12

7’6”

Over 20/12 to 21/12

8’0”

Minimum Height

Above Roof

Trim Plate

ST933

 

Fig. 46 Typical vertical venting configuration.

6.Install the ceiling support cathedral ceiling support box assembly, as appropriate.

7.Determine the distance from the appliance outlet to a point just above [approximately 12” (305 mm) to 24” (610 mm)] either the cathedral ceiling support box or the ceiling support plate and assemble lengths of pipe to satisfy this distance. Do not attach assembly to appli- ance.

8.Loosely position the support collar around the as- sembled lengths (flared end down).

9.From above, lower the assembled pipe sections down through the cathedral ceiling box or ceiling sup- port plate and attach it to the appliance adapter. The support collar should then be adjusted so that when the assembled lengths of pipe are attached to the ap- pliance, it rests on the bottom of the cathedral ceiling support box on top of the ceiling support plate.

10.Tighten the tabs of the collar. Secure the sup-

port collar by inserting three (3) #8 x 1/4” sheet metal

Fig. 47 Minimum Height Above Roof Requirements

NOTE: Whenever DIRECT-TEMP penetrates through a ceiling, a floor or a wall, it must be firestopped.

12.Using a level, make sure the system is perfectly vertical.

13.Slide the flashing, suitable for the roof pitch, down over the pipe protruding through the roof. Recheck orientation and use a silicone sealant around and under the perimeter of the flashing where it is in contact with the roof. Secure the flashing with roofing nails. Finish roofing around the pipe, covering the sides and upper ares of the flashing base with roofing material. How- ever, be sure the lower unnailed portion of the base covers the roofing material.

14.Position the storm collar around the pipe and slide down until it is in contact with the flashing. Secure the storm collar by inserting the two (2) tabs into the raised slots and fold tabs back. Seal the area between the storm collar and the vent pipe with a silicone sealant to prevent rain infiltration.

15.Install the vertical termination (VC) by inserting it down into the top most section of pipe until it is fully

26

20012950

Page 26
Image 26
Vermont Casting SDDVRBD, SDDVRC, SDDVRCCB, SDDVRCMB, SDDVRCB manual Stardance Direct Vent - Rear Vent Gas Heaters, 20012950