6. Installation Location
The installation location chosen must:
•Comply with all clearances listed below.
•Provide suitable location for the exhaust and intake venting.
•Not be installed in an unheated space.
•Comply with all local codes and standards.
Note: Dimensions shown are minimums. Greater clearances will simplify installation and service.
|
|
| 10.0 | i n |
|
2.0 | in |
|
|
|
|
|
|
|
| 2.0 in |
|
|
|
|
| 2 7 .7 | in |
8 .0 | in | 1 5 .8 | in |
|
|
1 2 .8 in
3 . 0 i n
CLOSET INSTALLA TION
MINIMUM PER MANAN T
CLEARANCE
1 8 .0 in
CLOSET INSTALLATION
SERVICECLEARANCE
FRON TVIEW | SIDE VIEW CLOSET |
| INSTALLATION |
Figure 6.1
WARNING: Do not install the boiler on carpeting
If the boiler is to be installed in an enclosed room with no fresh air intake, the room must have proper vent louvers installed. There should be two louvers, place each within 12” of the ceiling and floor respectively. Each vent will have a free area of 54 square inches.
Note: For boilers in an enclosed space it is recommended to install a CO detector in the boiler room.
|
|
|
|
|
|
|
|
| Air Opening |
|
|
|
|
|
|
|
|
| |
|
|
| 0 to 12" |
|
|
| |||
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Each opening free area = |
| |||||
|
|
| 1 sq. inch per 2,000 BTU/h | Outside | |||||
|
|
|
|
|
|
|
|
|
0 to 12" | Air Opening |
|
Figure 6.2
When choosing an installation location insure the exhaust and intake pipes comply with NFPA 54. The drawing on the next page illustrates the restrictions on exhaust locations.