Verona WALL HUNG GAS BOILER manual 15.8Labels placement, Commissioning Cont

Models: WALL HUNG GAS BOILER

1 40
Download 40 pages 26.81 Kb
Page 34
Image 34
15.8Labels placement:

15.Commissioning Cont.

15.8Labels placement:

4

5

3

2

1

Figure 15.10

Warning: The installation is not complete unless labels supplied are placed on the boiler as shown in Figure 15.10.

All the labels supplied with the boiler are numbered for reference.

According to Figure 15.10 place all the labels on the boiler. Use label numbered as 1 (already installed in the front panel) to begin the placement in the correct way.

RIVA HEAT ONLY MANUAL – REV A

34

Page 34
Image 34
Verona WALL HUNG GAS BOILER manual 15.8Labels placement, Commissioning Cont