Verona WALL HUNG GAS BOILER manual Piping Cont, 14.2Primary - Secondary Piping with Zone Valves

Models: WALL HUNG GAS BOILER

1 40
Download 40 pages 26.81 Kb
Page 28
Image 28
14.Piping Cont.

14.Piping Cont.

14.2Primary – Secondary Piping with Zone Valves:

All external piping components are to be supplied by the installer.

It is very important to use an hydraulic separator before secondary circulators.

 

 

 

 

25

 

 

 

 

 

23

 

 

 

 

 

 

 

24

 

 

 

 

 

10

 

 

 

 

11

 

9

27

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

7

 

 

1

 

 

 

 

 

 

 

 

6

5

 

 

 

 

 

 

 

 

 

 

 

 

15

 

 

 

18

 

 

 

 

 

20

 

 

 

 

 

 

 

 

14

4

 

17

 

 

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

19

 

 

 

 

 

 

22

 

 

 

 

 

 

21

 

 

 

30

 

 

 

28

29

 

 

 

 

 

 

 

 

 

 

Secondary Circulator

Supply Lines to System Zone Valve

zone

zone

zone

valve

valve

valve

 

 

Return Lines

 

 

 

 

from System

 

Hydraulic Separator

RIVA HEAT ONLY MANUAL - REV A

28

Page 28
Image 28
Verona WALL HUNG GAS BOILER manual Piping Cont, 14.2Primary - Secondary Piping with Zone Valves