Verona WALL HUNG GAS BOILER Checking the burner ignition, Adjustment of the useful c.h. output

Models: WALL HUNG GAS BOILER

1 40
Download 40 pages 26.81 Kb
Page 33
Image 33
15.6 Checking the burner ignition:
Turn the boiler OFF.
Open the gas valve outlet pressure test point 15 (figure 15.5) and connect the gauge.
Turn the boiler ON positioning the function selector B in the position shown in figure 15.7 and ensure that the room
Figure 15.7
• Loosen screws D and remove the service panel (figure 15.8).
B
Turn the boiler OFF.
Open the gas valve outlet pressure test point 15 (figure 15.5) and connect the gauge.
Turn the boiler ON positioning the function selector B in the position shown in figure 15.7 and ensure that the room thermostat is set to “heat demand”.

15. Commissioning Cont.

D

D

D

Figure 15.8

15.6 Checking the burner ignition:

 

 

• Watch the gauge and

 

+

 

RISC

 

check to see if the

 

+

 

ignition pressure

 

ACC

 

 

 

 

registerd corresponds

 

ON

 

to the values given in

 

1 2 3 4

 

the Technical Data.

 

 

 

Turn off the boiler and

 

OFF

 

 

 

 

reignite it by turning

 

Figure 15.9

 

Adjust the gas

 

the function selector

 

 

pressure at the

 

B to the 0 position

 

 

 

injectors to the value

 

and then back to that

 

 

 

indicated in the tables

 

indicated in figure

 

 

 

of section 2. By

 

15.7.

 

 

 

rotating the device

Repeat this process

 

 

clockwise the

 

two to three times

 

 

 

pressure increases.

 

leaving 30 second

 

 

After the adjustment

 

intervals between

 

 

operations bring the

 

each ignition. Check

 

 

 

selector 3 of figure

 

the ignition pressures

 

 

 

15.9 back to the

 

and visually check

 

 

 

normal position (ON).

 

that the burner lights

 

 

Reassemble the

 

uniformly and in a

 

 

service panel.

 

controlled manner.

 

 

• Close the gas valve

• To carry out the

 

outlet pressure test

 

adjustment move the

 

 

 

point 15 (figure 15.5).

 

function selector 3 to

 

 

Reassemble the front

 

the OFF position (Fig.

 

 

pannel of the case.

 

15.9) and use the

 

 

Important: after the

 

device (ACC).

 

checks all of the test

 

 

 

 

points must be sealed.

15.7 Adjustment of the useful c.h. output:

 

 

thermostat is set to

Adjust the gas

 

“heat demand”.

 

pressure at the burner

• Loosen screws D and

 

to the value according

 

remove the service

 

to the useful c.h.

 

panel (figure 15.8).

 

output wanted (Tab.

• To carry out the

 

15.1).

 

adjustment use the

Reassemble the

 

adjustment device

 

service panel.

 

(RISC) with the help

Close the gas valve

 

of a screwdriver.

 

outlet pressure test

• By rotating the device

 

point 15 (figure 15.5).

 

clockwise the

Reassemble the front

 

pressure increases.

 

pannel of the case.

RIVA HEAT ONLY MANUAL – REV A

33

Page 33
Image 33
Verona WALL HUNG GAS BOILER manual Checking the burner ignition, Adjustment of the useful c.h. output, Commissioning Cont