10. Pipe Connections

10. Pipe Connections

The Riva boiler is supplied with a 3/4” stainless steel gas pipe (A in figure 10.1), 2 - 3/4” copper pipe (C,D in figure 10.1), located in a plastic bag in the boiler package.

B

C

A

D

A)Stainless steel gas pipe

B)Main circuit drain cock

C)C.h. return copper pipe

D)C.h. supply copper pipe

E)C.h. PRV discharge copper pipe

E

Figure 10.1

Installation:

Remove the

use the proper

• If the c.h. system is

 

protective caps off

gaskets for the pipe

above the boiler level,

 

boiler connections

connections.

it is advisable to

 

(Figure 10.1).

• Before connecting the

install c.h. cocks

Thoroughly clean the

boiler to the heating

close to the boiler for

 

connections.

system piping, review

servicing operation

Attach the supplied

the suggested piping

 

 

components to the

diagrams in Section 4

 

 

boiler connections

(page 12).

 

 

(see Figures 10.1).

 

 

 

Be sure to

 

 

RIVA HEAT ONLY MANUAL - REV A

21

Page 21
Image 21
Verona WALL HUNG GAS BOILER manual Pipe Connections, Installation