14. Piping

14. Piping

14.1 Primary – Secondary Piping:

All external piping components are to be supplied by the installer.

It is very important to use an hydraulic separator before secondary circulators.

 

 

 

 

25

 

 

 

 

23

 

 

 

 

 

 

24

 

 

 

 

10

 

 

 

11

 

9

27

 

 

 

 

 

 

 

 

 

 

3

 

 

7

 

 

1

 

 

 

 

 

 

6

5

 

 

 

 

 

 

 

 

 

 

15

 

 

18

 

 

 

 

 

 

 

 

 

 

20

 

 

14

4

 

17

 

 

 

 

 

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

19

 

 

 

 

 

22

 

 

 

 

 

21

 

 

30

 

 

28

29

 

 

 

 

Hydraulic Separator

Max. Spacing

4x Primary Pipe

Dia. Typ.

Min. Spacing 12"

Secondary Circulator

Secondary Loops

RIVA HEAT ONLY MANUAL - REV A

27

Page 27
Image 27
Verona WALL HUNG GAS BOILER manual Primary - Secondary Piping