Viking Access Systems Q7 manual Operator Positioning, Gate Operator Installation

Models: Q7

1 50
Download 50 pages 11.63 Kb
Page 18
Image 18
Operator Positioning

GATE OPERATOR INSTALLATION

Operator Positioning

!IMPORTANT: All openings of a horizontal slide gate are guarded or screened from the bot- tom of the gate to a minimum of 4 feet (1.22 m) above the ground to prevent a 2-1/2 inch (57.2 mm) diameter sphere from passing through the openings anywhere in the gate, and in that portion of the adjacent fence that the gate covers in the open position.

1 6

VIKING TECHNICAL SUPPORT 1.800.908.0884

 

 

Page 18
Image 18
Viking Access Systems Q7 manual Operator Positioning, Gate Operator Installation