GATE OPERATOR INSTALLATION

Concrete Pad Installation

1. Follow the local building code to determine the required depth of the concrete pad.

2.Pad measurements recommended by Viking Access Systems are at least 28” long, 18” wide and 24” deep to ensure the stable operation of the operator, and a minimum of 4” above level grade to avoid any flooding of the machinery.

3.Provide a sufficient number of conduit pathways for all low power accessories such as loop detector leads, maglock, non-contact sensors, contact sensors, safety and other commands. Also provide conduit for the power supply to the operator.

!DO NOT run low voltage and high voltage wiring in the same conduit.

!Provide at least 12” separation between low and high voltage conduits.

1 4

VIKING TECHNICAL SUPPORT 1.800.908.0884

 

 

Page 16
Image 16
Viking Access Systems Q7 manual Gate Operator Installation, Concrete Pad Installation