Assembly Instructions

Implement Hitch Wiring

1.Drill five (5) 13/64 in. (5 mm) diameter holes in the tractor, two in the FSC lever and three in the body, as shown in the illustration.

Drill Holes for Implement Hitch Wiring

2.Attach the toggle switch mounting bracket on the FSC lever using two (2) 10-24 x 1/2 in. bolts and Keps nuts. Connect the green ground wire from the actuator wiring harness to one of the bolts of the switch mounting bracket.

Mounting

Bracket

Wiring

Harness

Ground

Wire

Attach Toggle Switch Mounting Bracket

3.Install the wiring harness to the tractor body us- ing the three wiring clamps, three 10-24 x 3/8 in. bolts and Keps nuts.

4.Attach the toggle switch to the mounting brack- et, placing the switch terminals toward the front of the mower.

Mounting Bracket

Wiring Clamps

Switch

 

Terminals

Harness

Attach Wiring Harness and Toggle Switch

5.On Models MC, MDD/MDG, and MT, connect the harness red wire to the load side of the cir- cuit breaker mounted on the bracket behind the battery.

Red Wire

Circuit Breaker

Connect Harness Wire to Circuit Breaker

IMPORTANT: For all 1987-1997 Model MC tractors (with Kohler Magnum engine), connect the harness red wire to the free connector of the PTO clutch switch red wire. Refer to Implement Hitch Wiring Diagram illustration.

20

Page 24
Image 24
Walker IH6620, SB6670, DB6680, DB6660, RB6650 Drill Holes for Implement Hitch Wiring, Attach Toggle Switch Mounting Bracket