![Installation](/images/new-backgrounds/44850/4485013x1.webp)
Installation
Begin the installation of the door by checking the opening. It must be the same size as the door. Vertical jambs must be plumb and the header level. Side clearance, from edge of door to wall, must be minimum of
IMPORTANT: Stainless steel or PT 2000 coated lag screws (not supplied) MUST be used when installing center bearing brackets, end brackets, jamb brackets, operator mounting/support brackets and disconnect brackets on treated lumber
NOTE: It is recommended that 5/16” lag screws be pilot drilled using a 3/16” drill bit prior to fastening.
IMPORTANT: When installing 5/16” diameter lag screws using an electric drill/driver, the drill/driver’s clutch must be set to deliver no more than 200 in. lbs. of torque. Fastener failure could occur at a higher setting.
NOTE: Insulated glass will cause the top section to be significantly heavier than the remaining sections.
1
Tools Needed:
None
Attaching Flagangles to Vertical
Tracks
If you have fully adjustable flagangles: Hand tighten the flagangle to the vertical track using a stud plate and (2) 1/4” - 20 flange hex nuts. Repeat for other side.
Secure the flange nuts after flagangle spacing is completed in Step 11.
If you have quick install flagangles:
Place the lower quick install tab of the flagangle in the quick install feature of the vertical track. Give the flagangle 1/4 turn to lock in place. Repeat for other side.
flagangle
(2)1/4”- 20 flange hex nuts
Stud Plate
Vertical track
quick install flagangle
FLAGANGLE
VERTICAL
TRACK
Fully Adjustable Flagangle
QUICK INSTALL TAB UNLOCKED | QUICK INSTALL TAB LOCKED |
|
|
|
Please Do Not Return This Product To The Store. Contact your local | 7 | |
local yellow pages business listings or go to the Find a Dealer section online at |
|
|