Wayne-Dalton 9800 Adjusting Top Brackets, Torsion End Bearing Brackets, Installation

Models: 9800

1 26
Download 26 pages 11.64 Kb
Page 15
Image 15
Adjusting Top Brackets

 

 

11

Adjusting Top Brackets

 

 

 

Tools Needed:

With horizontal tracks installed, you can

Power Drill

now adjust the top brackets. Vertically

align the top section of the door with the

 

7/16” Socket

lower sections. Once aligned, position

the top bracket slide, out against the

Driver

horizontal track.

 

7/16” Wrench

Maintaining the slide’s position, tighten

 

Step Ladder

the (1) 5/16” - 18 nut to secure the slide

 

to the top bracket. Next lock the top

 

slide into place on the top bracket using

 

(1) 1/4” - 20 x 9/16” track bolt and (1)

 

1/4” - 20 hex nut through any two

 

aligning holes. Repeat for other side.

Top

Top

section

section

Correct

Incorrect

TOP BRACKET

BASE

TOP BRACKET slide INSTALLATION

Top

SECTION

(1) 1/4” - 20 hex NUT

INSTALLATION

(1)1/4”- 20 x 9/16” track bolt

(1)5/16”- 18 NUT

12

Torsion End Bearing Brackets

Right hand end

Left hand

bearing bracket

end bearing

 

 

 

 

bracket

Tools Needed:

End bearing brackets are right and left

 

UPPER SLOTS

Power Drill

 

USED ON 15”

hand. Break the end bearing brackets

 

 

RADIUS TRACK

7/16” Socket

apart.

 

 

 

Starting on the left hand side and using

 

 

Driver

 

Wallangle

the upper slots in the end bearing

 

9/16” Socket

 

Break

 

bracket, position above the wallangle

 

Ratchet Wrench

the end

 

and secure the end bearing bracket to

 

bearing

 

9/16” Wrench

the horizontal angle using (2) 3/8”-16

Horizontal

brackets

x 3/4” truss head bolts and (2) 3/8”-16

Step Ladder

apart

angle

nuts.

 

 

 

 

Left hand end

 

 

 

 

IMPORTANT: End bearing brackets

 

bearing bracket

 

 

 

 

must be attached through the

(1) 5/16” x 1-5/8”

(2) 3/8”-16 x 3/4”

 

upper slots on 15” radius track.

 

 

lag screw

truss head bolts

 

Once the bracket is secured to the

Wallangle

 

 

horizontal angle, secure the top of the

 

 

 

 

 

end bearing bracket to the jamb using

 

 

(1)5/16” x 1-5/8” lag screw. Repeat for right hand side.

NOTE: Right and left hand is always

(2) 3/8”-16

 

nuts

 

determined from inside the building

 

Horizontal

 

looking out.

 

angle

 

 

 

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.

15

To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at www.wayne-dalton.com

Page 15
Image 15
Wayne-Dalton 9800 installation instructions Adjusting Top Brackets, Torsion End Bearing Brackets, Installation