|
|
|
4 | Bottom Section | |
| ||
|
|
|
Tools Needed: | Center the bottom section in the door | |
Level | opening. Level section using wooden | |
| shims (if necessary) under the bottom | |
| section. |
Level
BOTTOM
SECTION
wooden shims (if necessary)
5 | Vertical Track Assembly | Wall Angle | Clip mount (Your clip mount | |
| ||||
|
| |||
Tools Needed: | IMPORTANT: The tops of the vertical |
| Quantity and location may vary) | |
|
| |||
Power Drill | tracks must be level from side to side. |
|
| |
If the bottom section was shimmed |
|
| ||
3/16” Drill Bit |
|
| ||
to level it. The vertical track on the |
|
| ||
7/16” Socket | shimmed side, must be raised the height |
|
| |
of the shim. | vertical track |
| ||
Driver |
| |||
Position the left hand vertical track assembly | Assembly |
| ||
|
| |||
Level |
|
| ||
over the rollers of the bottom section. Make |
|
| ||
| 5/16” x |
| ||
Tape Measure | sure the counterbalance cable is located |
| ||
Step Ladder | between the rollers and the door jamb. Drill | LAG SCREWS | lag | |
3/16” pilot holes for the lag screws. Loosely | (Your number | |||
(Concrete | of lag | screw | ||
attach the wall angle to the jamb using | ||||
screws may |
| |||
Mounting) | 5/16” x |
| ||
vary) |
| |||
3/8” Simpson | lag screw, securing the wall angle to jamb, |
| ||
| Wall | |||
Titen HD, | maintaining 5/8” track spacing between the |
| ||
Min Embed Into | vertical track and bottom section. Repeat for |
| Angle | |
Min 2000 PSI | the right hand side. |
| vertical track | |
| BOTTOM | |||
Concrete at 15” |
| |||
|
| |||
| SECTION |
| ||
O.C. Max. |
| BOTTOM SECTION | ||
|
|
roller | 5/8” |
| |
Please Do Not Return This Product To The Store. Contact your local | 9 |
To find your