13.Press two 1” x 2” Inner Caps (83) into the indicated end of the Squat Arm (79).

Lubricate a 3/8” x 3 1/4” Bolt (85). Attach the Squat Arm (79) to the Front Upright (42) with the Bolt and a 3/8” Nylon Locknut (21).

Attach a Handle (92) to one side of the Squat

Arm (79) with a 5/16” x 2 1/2” Bolt (22), two 5/16” W ashers (8), a 1/2” x 17/32” Spacer (94), and a 5/16” Nylon Locknut (3).

Attach the other Handle (92) to the other side of the Squat Arm (79) in the same manner.

ARM ASSEMBLY

14.During steps 15 through 39, refer to the CABLE DIAGRAMS on pages 26 and 27 of this manual to verify proper cable routing.

Before beginning this section, identify the High Cable (23), the Low Cable (86), the Rear Cable (95), and the Press Cable (58) by comparing the lengths and ends of the

cables.

IMPORTANT: While assembling the cables, do not overtighten the bolts and nuts securing the pulleys. The pulleys must be able to turn freely.

ASSEMBLY

15.

Pulley to the Top Frame (55) with a 3/8” x

 

Locate the High Cable (23).

Wrap the High

 

 

Cable around a 3 1/2” Pulley (15). Attach the

CABLE

 

3 .3/4” Bolt (71) and a 3/8” Nylon Locknut

 

the ball is on the indicated side of the

 

 

 

(21). Be sure that the end of the Cable with

Pulley and that the Cable is between the

Pulley and the hook.

10

13

 

 

 

 

 

8

22

 

 

92

22

 

83

 

 

94

 

83

 

 

8

8

 

92

 

 

3

 

94

8

79

21

 

 

 

3

 

 

 

 

 

 

 

42

 

 

 

85

 

 

 

Lubricate

14

 

 

 

 

 

 

86 (148”)

 

 

 

23 (159”)

 

 

 

58 (47”)

 

 

 

95 (141”)

15

 

 

23

 

 

55

 

 

 

21

 

 

 

 

Ball

15

 

 

 

 

 

Hook

71

 

 

Page 10
Image 10
Weider WESY97300 user manual Locate the High Cable