York YR manual Passes

Models: YR

1 40
Download 40 pages 10.54 Kb
Page 31
Image 31

FORM 160.81-EG1

Dimensions (mm) – Nozzle Arrangements

CONDENSERS – COMPACT WATER BOXES

FRONT

FRONT

OF UNIT

OF UNIT

1-PASS

 

 

 

 

Q

 

 

 

 

 

 

 

P

NOZZLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARRANGEMENTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO. OF

COND.

 

 

 

 

 

 

 

 

 

CC

CC

 

 

 

 

 

 

 

 

 

PASSES

IN

OUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

P

Q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONDENSER

 

 

 

 

 

 

CONDENSER

Q

P

 

 

 

 

 

 

 

 

 

 

 

GG

 

 

 

 

 

1"

 

 

 

 

1"

 

 

 

 

 

GG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPRESSOR END

 

FLOOR LINE

MOTOR END

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FRONT

FRONT

 

 

 

 

 

 

 

 

 

 

 

 

 

2-PASS

 

 

 

 

 

 

 

 

 

OF UNIT

OF UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOZZLE

U

 

 

S

T

 

 

R

 

DD

DD

 

 

BB

BB

 

CONDENSER

 

 

CONDENSER

GG

1"

1"

GG

 

 

COMPRESSOR END

 

FLOOR LINE

MOTOR END

 

 

ARRANGEMENTS

NO. OF

COND.

PASSES

IN

OUT

2

R

S

T

U

 

NOTE: Water must enter through bottom connection to achieve rated performance

FRONT

FRONT

3-PASS

OF UNIT

OF UNIT

 

 

 

 

 

 

NOZZLE

Y

 

 

 

W

X

 

 

 

V

 

DD

 

DD

 

 

BB

 

BB

 

CONDENSER

 

 

 

CONDENSER

GG

1"

 

1"

GG

 

FLOOR LINE

 

COMPRESSOR END

 

 

 

 

 

 

MOTOR END

ARRANGEMENTS

NO. OF

COND.

PASSES

IN

OUT

3

V

Y

X

W

 

NOTE: Water must enter through bottom connection to achieve rated performance

LD07983

CONDENSER

NOZZLE PIPE SIZE

 

 

 

 

 

CONDENSER

 

 

 

 

 

 

 

NOZZLE DIMENSIONS

 

 

 

SHELL

 

 

 

 

 

 

 

 

 

 

NO. OF PASSES

 

1-PASS

 

 

2-PASS

 

 

3-PASS

 

CODE

 

 

 

 

 

 

1

2

 

3

CC2

G G

BB2

 

DD2

G G

BB2

D D2

G G

 

 

 

T, V

10"

6"

 

6"

730

381

553

 

908

381

553

908

381

W, X

12"

8"

 

6"

781

394

584

 

978

394

584

978

394

NOTES:

1.Standard water nozzles are furnished as welding stub-outs with Victaulic grooves, allowing the option of welding, flanges, or use of Victaulic couplings. Factory installed, class 150 (ANSI B16.5, round slip-on, forged carbon steel with 1.59 mm raised face), water flanged nozzles are optional (add 12.7 mm to nozzle length). Companion flanges, nuts, bolts, and gaskets are not furnished.

2.Add 25.4 mm for isolators as shown.

3.One-, two- and three-pass nozzle arrangements are available only in pairs shown and for all shell codes. Any pair of condenser nozzles may be used in combination with any pair of evaporator nozzles.

4.Connected piping should allow for removal of compact water boxes for tube access and cleaning.

5.Front of unit is defined as side of chiller where control center is mounted.

YORK INTERNATIONAL

31

Page 31
Image 31
York YR manual Passes