York YR manual Portable Refrigerant STORAGE/RECY- Cling System, START-UP and Operator Training

Models: YR

1 40
Download 40 pages 10.54 Kb
Page 40
Image 40

Guide Specifications

Standard features include: digital readout at the OptiV- iew Control Center of the following:

Display Only:

3-phase voltage A, B, C

3-phase current A, B, C

Input power (kW)

kW Hours

Starter Model

Motor Run (LED)

Motor Current % Full-load Amps

Current Limit Setpoints

Pulldown Demand Time Left

Programmable:

Local Motor Current Limit

Pulldown Demand Limit

Pulldown Demand Time

Other features include: low-line voltage, 115-volt con- trol transformer; three-leg sensing overloads; phase ro- tation and single-phase failure protection; high tempera- ture safety protection, motor current imbalance and undervoltage safeties; open and close SCR protection; momentary power interruption protection. The LCSSS is cooled by a closed loop, fresh water circuit consist- ing of a water-to-water heat exchanger and 1/25 HP circulating pump. All interconnecting water piping is factory installed and rated for 150 PSIG working pres- sure. Optional unit-mounted circuit breaker includes

ground fault protection and provides 65,000 amp. Short circuit withstand rating in accordance with UL Standard

508.A non-fused disconnect switch is also available. Both options are padlockable.

REMOTE ELECTRO-MECHANICAL COMPRES- SOR MOTOR STARTER (OPTIONAL)

A remote electro-mechanical starter of the R-1131 type shall be furnished for each compressor motor. The starter shall be furnished in accordance with the chiller manufacturer’s starter specifications and as specified elsewhere in these specifications.

PORTABLE REFRIGERANT STORAGE/RECY- CLING SYSTEM

A portable, self-contained refrigerant storage/recycling system shall be provided consisting of a refrigerant com- pressor with oil separator, storage receiver, water cooled condenser, filter drier and necessary valves and hoses to remove, replace and distill refrigerant. All necessary controls and safety devices shall be a permanent part of the system.

START-UP AND OPERATOR TRAINING

The chiller manufacturer shall include the services of a factory-trained, field service representative to super- vise the final leak testing, charging and the initial start- up and concurrent operator instruction.

P.O. Box 1592, York, Pennsylvania USA 17405-1592

Tele. 800-861-1001

Subject to change without notice. Printed in USA

Copyright © by York International Corporation 2002

www.york.com

ALL RIGHTS RESERVED

Form 160.81-EG1 (502)

 

 

Supersedes 160.81-EG1 (302)

 

 

Page 40
Image 40
York YR manual Portable Refrigerant STORAGE/RECY- Cling System, START-UP and Operator Training