Generac 13694330200 owner manual Maint Maintenance Maintenance Tasks Task Completed

Page 24

Maintenance

Maint

Maintenance

Maintenance Tasks

Task Completed

Level

Interval

Date/lnitials

 

 

 

 

 

 

 

1. Disable the unit from operating per the first page warning.

 

 

 

 

 

 

 

2. Check the engine oil level. Adjust as necessary.

 

 

 

 

 

 

 

3, Check the engine coolant level. Adjust as necessary,

 

 

 

 

 

 

 

4, Check the battery electrolyte level if accessible, Adjust as necessary,

 

 

 

 

 

 

 

5, Check the diesel fuel supply level. Adjust as necessary.

 

 

First 6 months

 

 

 

6, Drain water and sediment from the diesel fuel tank.

 

 

or

 

 

 

 

 

50 hours of

7. Drain water from the diesel fuel line water separator if unit is equipped

 

 

operation

 

1A

ONLY

with one,

 

(Requires

8, Check the air inlets and outlets for debris, Clean as necessary,

 

 

 

 

 

 

 

approximately

g, Visually inspect the unit looking for leaks, wear or damage, loose

 

 

2,5 man hours

 

 

per unit)

connections or components, and corrosion, Correct as necessary,

 

 

 

1O, Initiate an automatic start and transfer to load of the unit, and exercise it

 

 

 

for at least 1 hour looking for leaks, loose connections or components,

 

 

 

and abnormal operating conditions, Correct as necessary,

 

 

 

11, Change the engine oil.

 

 

 

 

 

 

 

12, Replace the engine oil

 

 

 

 

 

 

 

13. Replace the engine fuel filter(s),

 

 

 

 

 

 

 

14, Return the unit to stand-by setup for operation when required,

 

 

 

 

 

Technician'sSignature

Date Inspection Completed

Unit Hour Meter Reading at Completion of the Inspection

22

Image 24
Contents @us Table of Contents Authorized Service Dealer Location Operation and MaintenanceHOW to Obtain Service IntroductionGeneral Hazards Electrical Hazards Identification Record Data LabelGenerator SET XPL Label Equipment Description Engine Protective DevicesDC Fuses Specifications Fuel SystemBattery Installation Fuel System Reduirements and RecommendationsBattery Generator AC LeadConnections SIX-LEAD VAG, THREE-PHASE Stator Field Wiring Requirements TableField Wiring Connections to Buss Bars Generator and Load CompatibilityStarting Aids ~KE~ Engine Coolant HeatersBattery Warmers Optional Battery ChargersNfpa Standards Other Published StandardsTransfer Switch Start Signal Connections Emergency Circuit Isolation MethodTotal Circuit Isolation Method Grounding the GeneratorPreparation Before START-UP Vented BatteriesPrior to Initial START-UP Operating Unit with Manual Transfer Switch Generator Control and OperationEngine STA8T-UP and TRANSFE8 Transfer Switch Service ScheduleRetransfer and Shutdown Periodic Maintenance Annually or Every 600 Hours whichever comes firstRepair Parts HOW to Order PartsCheck Fluids Inspect Exhaust SystemService Maintenance Interval Information Maintenance Tasks Maint Maintenance Maintenance Tasks Task Completed Maint Maintenance Maintenance Tasks Task Completed Maint Maintenance Maintenance Tasks Task Completed Level Maintenance Tasks Task Completed TechniciansSignature Warranty California and Federal Emission Control Warranty Statement Warranty Groupb Groupb 34h ~tJ· ~tJ Grouph Grouph Exploded View EV, CB Mounting KIT MDl Drawing # OJl027 Group a Group a ~ //rY Exploded View EV Altcomprt 80KW DD PME G17 Drawing # OJ1481 Applicable to PART# This page Left Intentionally Blank Group a MAIN, ALT Tower 390 Long 10 390 Alternator Single CIS 390/520 Alternator Dual CIS Load CENTER,125A,SIEMENS 8 BAY\ Group B Blank 171\\ PART# QTY Description QTY Date 7/27//11 Exploded View Drawing # OH5043D Group H Drawing # OH5043D Part Date 2/25/10 FAN Guard R/H Side GROUpe GROUpe 111 GROUpe 180 Basetank CD0095U1N Type GROUpe GROUpe Groupd Groupd ~14 Reducer Hump 18\\ Groupf Groupf Groupf 3 of4 This page left blank intentionally ~-+-+ + + This page is Left Intentionally Blank Groupg Groupg ~ o ===~ ~ o DO-~~ ~ o Nl ---+ + + + 1 Groupg Groupg ~~r= ~~~~WHtjITEt=~= ~S NC RB3 ~~~~~~ 5005~ ~fi Ir~ Drawing # OH9863 ~~BR2DB Drawing # OH9863 Group H This page is Left Intentionally Blank 2ASSEMBY View for Shroud OH78890ST03 only QTY Description RevisionH-6657-C 1of Clamp Hose 7/8 00 Double Wire Date 2/12/10 Washer Date 3/21/10 Drawing No. OH8028 Junction BOX Alternate Dual Battery Configuration Battery Heater Connection Rl.·1 Drawing # OJI047 Page JNI ISWEU.SAS tl3MOd ,,Jdtl3N3EJ