Generac 13694330200 owner manual Maint Maintenance Maintenance Tasks Task Completed Level

Page 26

Maintenance

Maint

Maintenance

Maintenance Tasks

Task Completed

level

Interval

Date/lnitials

 

 

 

 

 

 

 

1. Disable the unit from operating per the first page warning.

 

 

 

 

 

 

 

2. Check the engine oil level. Adjust as necessary.

 

 

 

 

 

 

 

3. Check the engine coolant level. Adjust as necessary.

 

 

 

 

 

 

 

4. Check the engine coolant thermal protection level. Correct as neces-

 

 

 

sary.

 

 

 

 

 

 

 

5. Check the diesel fuel supply level. Adjust as necessary.

 

 

 

 

 

 

Every 12 months

6. Drain water and sediment from the diesel fuel tank.

 

 

 

 

 

or

7. Drain water from the diesel fuel line water separator if unit is equipped

 

 

100 hours of

with one.

 

3

operation

8. Check the air inlets and outlets for debris. Clean as necessary.

 

 

 

 

 

 

 

(Requires

9. Check the battery electrolyte level if accessible. Adjust as

 

 

necessary.

 

 

approximately

 

 

 

 

 

4,0 man hours

10. Check the battery posts, cables, and charger for loose connections,

 

 

per unit)

 

 

corrosion, and proper operation. Correct as necessary.

 

 

 

 

 

 

 

 

 

 

11. Check the unit wiring for loose connections, corrosion, and damage.

 

 

 

Correct as necessary.

 

 

 

 

 

 

 

12. Check the engine accessory drive belts for wear, weather cracking,

 

 

 

and damage. Replace as necessary.

 

 

 

 

 

 

 

13. Test the unit safety devices (alarms, shutdowns, etc.) for proper

 

 

 

operation. Correct and/or adjust as necessary.

 

 

 

 

 

 

 

14. Perform an oil analysis (send asample to a lab for results). Change the

 

 

 

engine oil and filters if the analysis results indicate this is required.

 

 

 

 

 

 

 

15. Visually inspect the unit looking for leaks, wear or damage, loose

 

 

 

connections or components, and corrosion. Correct as necessary.

 

 

 

 

 

 

 

16. Start and exercise the unit under full rated load for at least 2 hours look-

 

 

 

ing for leaks, loose connections or components, and abnormal operating

 

 

 

conditions. Correct as necessary.

 

 

 

17. Return the unit to standby setup for operation when required.

 

 

 

 

 

Technician'sSignature

Date Inspection Completed

Unit Hour Meter Reading at Completion of the Inspection

24

Image 26
Contents @us Table of Contents HOW to Obtain Service Authorized Service Dealer LocationOperation and Maintenance IntroductionGeneral Hazards Electrical Hazards Generator SET XPL Label Identification RecordData Label DC Fuses Equipment DescriptionEngine Protective Devices Specifications Fuel SystemBattery Installation Fuel System Reduirements and RecommendationsConnections BatteryGenerator AC Lead SIX-LEAD VAG, THREE-PHASE Stator Field Wiring Requirements TableStarting Aids Field Wiring Connections to Buss BarsGenerator and Load Compatibility ~KE~ Engine Coolant HeatersBattery Warmers Optional Battery ChargersNfpa Standards Other Published StandardsTotal Circuit Isolation Method Transfer Switch Start Signal ConnectionsEmergency Circuit Isolation Method Grounding the GeneratorPrior to Initial START-UP Preparation Before START-UPVented Batteries Engine STA8T-UP and TRANSFE8 Operating Unit with Manual Transfer SwitchGenerator Control and Operation Retransfer and Shutdown Transfer SwitchService Schedule Periodic Maintenance Annually or Every 600 Hours whichever comes firstCheck Fluids Repair PartsHOW to Order Parts Inspect Exhaust SystemService Maintenance Interval Information Maintenance Tasks Maint Maintenance Maintenance Tasks Task Completed Maint Maintenance Maintenance Tasks Task Completed Maint Maintenance Maintenance Tasks Task Completed Level Maintenance Tasks Task Completed TechniciansSignature Warranty California and Federal Emission Control Warranty Statement Warranty Groupb Groupb 34h ~tJ· ~tJ Grouph Grouph Exploded View EV, CB Mounting KIT MDl Drawing # OJl027 Group a Group a ~ //rY Exploded View EV Altcomprt 80KW DD PME G17 Drawing # OJ1481 Applicable to PART# This page Left Intentionally Blank Group a MAIN, ALT Tower 390 Long 10 390 Alternator Single CIS 390/520 Alternator Dual CIS Load CENTER,125A,SIEMENS 8 BAY\ Group B Blank 171\\ PART# QTY Description QTY Date 7/27//11 Exploded View Drawing # OH5043D Group H Drawing # OH5043D Part Date 2/25/10 FAN Guard R/H Side GROUpe GROUpe 111 GROUpe 180 Basetank CD0095U1N Type GROUpe GROUpe Groupd Groupd ~14 Reducer Hump 18\\ Groupf Groupf Groupf 3 of4 This page left blank intentionally ~-+-+ + + This page is Left Intentionally Blank Groupg Groupg ~ o ===~ ~ o DO-~~ ~ o Nl ---+ + + + 1 Groupg Groupg ~~r= ~~~~WHtjITEt=~= ~S NC RB3 ~~~~~~ 5005~ ~fi Ir~ Drawing # OH9863 ~~BR2DB Drawing # OH9863 Group H This page is Left Intentionally Blank 2ASSEMBY View for Shroud OH78890ST03 only QTY Description RevisionH-6657-C 1of Clamp Hose 7/8 00 Double Wire Date 2/12/10 Washer Date 3/21/10 Drawing No. OH8028 Junction BOX Alternate Dual Battery Configuration Battery Heater Connection Rl.·1 Drawing # OJI047 Page JNI ISWEU.SAS tl3MOd ,,Jdtl3N3EJ