Fuel System

Make sure the fuel supply system to the generator (a) delivers the correct fuel at the correct pressure and (b) is properly purged and leak tested according to code. No fuel leakage is permitted. See "Specifications" for more information

If the unit has been idle for along period of time, or if the fuel lines or system components have been removed and reinstalled, the fuel system may require bleeding to remove air from the system. Air in the fuel system causes hard starting and rough operation. All fuel system lines must be installed and must be tight A loose line may show no sign of leakage, but may draw air into the system.

ACAUTIONI

AUse a suitable container to catch the fuel

.... that will spill during system bleeding pro- cess. Clean up all spilled fuel after bleeding.

Generator Set Lubrication

Check the engine crankcase oil level befol'eoperating and add oil to the proper level - the dipstick "FULL'mark. Never operate the engine with the oil level below the dipstick "ADD" mark. See "Specifications" and "Engine Oil Recommendations"

Check the oil level in the generator gearbox (if so equipped) prior to initial use and at the intervals indicated by the" Service Schedule." The recommended oil is SAE 90 gear lubricant

Also, if the engine is equipped with a mechanical governor, make sure the governor is properly lubricated with clean engine oil.

Engine Coolant

Have the engine cooling system properly filled with the recom- mended coolant mixture. Check the system for leaks and other problems. See "Specifications" and "Coolant"

Belt Tension

Check the engine fan belt tension and condition prior to placing the unit into service and at recommended intervals. Belt tension is correct when aforce of approximately 22 pounds (10 kg), applied midway between pulleys, deflects the belt about 3/8- to 5/8-inch (10 to 16 mm). This does not apply to automatic belt tensioning systems.

Electrical System

Make sure the generator is properly connected to an approved earth ground.

Make sure the generator battery is fUlly charged, properly installed and interconnected, and ready for use.

Check to ensure that there are no loose electrical connections, Restrain any loose wires to keep them clear of any moving genera- tor set components.

Rodent Protection

Make sure the four, 3-inch diameter cap plugs are properly installed in the tie-down holes in the side rails of the unit'sbase frame (Figure 2.3). The cap plugs are shipped in a plastic bag located in the lower connection box. These plugs are needed to prevent rodents from accessing the interior of the generator set On acoustic units, cap plugs also are needed to stay within noise specification limits.

Figure 2.3 - Base Frame Cap Plugs

BASE

3-INCH CIA.

FRAME

PLUG

STA8r-UP INSPECTION

Astandard form titled "Start-up Inspection for Stationary Emergency Power Systems" (part no. 067377) should be completed by the installation technician or engineer. As stated on the form, inspec- tions are to be accomplished only by factory-trained personnel.

The technician performing the install should then scan and e-mail the completed form to service@generac.com. The form can also be filled out at a dealer'sGenerac website.

GENERATOR CONTROL AND OPERATION

Refer to the appropriate control panel operator'smanual for this unit

OPERATING UNIT WITH MANUAL TRANSFER SWITCH

If the generator was installed in conjunction with atransfer switch capable of manual operation only, the following procedure applies. A manually operated transfer switch is one that will not provide automatic start-up and does not include an intelligence circuit

ENGINE STA8T-UP AND TRANSFE8

For additional information, refer to the applicable control panel manual for this unit, as well as any literature pertaining to the transfer switch.

16

Image 18
Contents @us Table of Contents HOW to Obtain Service Authorized Service Dealer LocationOperation and Maintenance IntroductionGeneral Hazards Electrical Hazards Identification Record Data LabelGenerator SET XPL Label Equipment Description Engine Protective DevicesDC Fuses Specifications Fuel SystemBattery Installation Fuel System Reduirements and RecommendationsBattery Generator AC LeadConnections SIX-LEAD VAG, THREE-PHASE Stator Field Wiring Requirements TableField Wiring Connections to Buss Bars Generator and Load CompatibilityStarting Aids ~KE~ Engine Coolant HeatersBattery Warmers Optional Battery ChargersNfpa Standards Other Published StandardsTotal Circuit Isolation Method Transfer Switch Start Signal ConnectionsEmergency Circuit Isolation Method Grounding the GeneratorPreparation Before START-UP Vented BatteriesPrior to Initial START-UP Operating Unit with Manual Transfer Switch Generator Control and OperationEngine STA8T-UP and TRANSFE8 Transfer Switch Service ScheduleRetransfer and Shutdown Periodic Maintenance Annually or Every 600 Hours whichever comes firstCheck Fluids Repair PartsHOW to Order Parts Inspect Exhaust SystemService Maintenance Interval Information Maintenance Tasks Maint Maintenance Maintenance Tasks Task Completed Maint Maintenance Maintenance Tasks Task Completed Maint Maintenance Maintenance Tasks Task Completed Level Maintenance Tasks Task Completed TechniciansSignature Warranty California and Federal Emission Control Warranty Statement Warranty Groupb Groupb 34h ~tJ· ~tJ Grouph Grouph Exploded View EV, CB Mounting KIT MDl Drawing # OJl027 Group a Group a ~ //rY Exploded View EV Altcomprt 80KW DD PME G17 Drawing # OJ1481 Applicable to PART# This page Left Intentionally Blank Group a MAIN, ALT Tower 390 Long 10 390 Alternator Single CIS 390/520 Alternator Dual CIS Load CENTER,125A,SIEMENS 8 BAY\ Group B Blank 171\\ PART# QTY Description QTY Date 7/27//11 Exploded View Drawing # OH5043D Group H Drawing # OH5043D Part Date 2/25/10 FAN Guard R/H Side GROUpe GROUpe 111 GROUpe 180 Basetank CD0095U1N Type GROUpe GROUpe Groupd Groupd ~14 Reducer Hump 18\\ Groupf Groupf Groupf 3 of4 This page left blank intentionally ~-+-+ + + This page is Left Intentionally Blank Groupg Groupg ~ o ===~ ~ o DO-~~ ~ o Nl ---+ + + + 1 Groupg Groupg ~~r= ~~~~WHtjITEt=~= ~S NC RB3 ~~~~~~ 5005~ ~fi Ir~ Drawing # OH9863 ~~BR2DB Drawing # OH9863 Group H This page is Left Intentionally Blank 2ASSEMBY View for Shroud OH78890ST03 only QTY Description RevisionH-6657-C 1of Clamp Hose 7/8 00 Double Wire Date 2/12/10 Washer Date 3/21/10 Drawing No. OH8028 Junction BOX Alternate Dual Battery Configuration Battery Heater Connection Rl.·1 Drawing # OJI047 Page JNI ISWEU.SAS tl3MOd ,,Jdtl3N3EJ