Baldor ISO9001 manual Operation

Page 35

OPERATION

The Prime mover utilized in this power generating system is controlled via an engine control module.

Starting is accomplished by commanding the control to "start" the engine. This command can be given by a number of controls;

The operator control mounted on the front panel.

The remote controls via the transfer switch or remote start terminal.

Initially, the system may be started and operated by placing the operation control in the "manual" position. To cease operation, return the switch to the "off" position.

Clear unit of all loose objects and perform all "pre- start" procedures before operating generator system.

ENGINE CONTROL MODULE

The Engine Control Module (E.C.M.) is a microprocessor based module that monitors the control and safety inputs and provides all the required START and STOP functions automatically.

The following front panel controls and instruments are wired into the microprocessor through the E.C.M. terminal blocks:

1.RUN / OFF / AUTO SWITCH

A."RUN" - run position causes the generator set to start and run immediately.

B."AUTO" - auto position allows unit to be controlled via any remote single-pole "dry" contact (transfer switch, etc.). Contact closure causes the unit to start and run, while contact opening causes unit to shut down after a preset cool down period.

C."OFF" - unit operation is terminated.

2.LAMP TEST

A.Push button energizes all alarm lights simultaneously. This feature is disabled with the Run / stop / auto switch in the "stop" position and has no other effect on unit operation.

SAFETY INPUTS

1.Low Oil Pressure Shut-down- (LOP)

Monitoring of oil pressure begins for a preset time after unit starts and remains in effect until unit is shut down (except as noted in "loss of frequency input". The LOP signal is derived from an oil pressure switch gauge mounted on the control panel.

2.High Temperature Shutdown (HT)

The engine temperature monitoring begins immediately with the start signal. However, if engine temperature is excessive prior to start (i.e. heat soak after shutdown), the unit is permitted to start. The High temperature condition is permitted to exist for up to 60 seconds after the unit is running before shutdown when alarm occurs. If the excessive temperature condition is corrected within that time period, the HT circuit reverts to normal monitoring. The HT signal is derived from a monitoring device located on the prime mover.

Image 35
Contents Standby Permanent Mount Series Generator Forward Page Page Ż ż for Gasoline or Diesel Powered Generator Sets ż ż ż ż Ż ż for Gasoline or Diesel Powered Generator Sets ż ż ż ż Standby PERMANENT- Mount Series Generator Baldor Baldor Generator Features OptionsEngine Specifications Farm Duty 1-Phase Model DLC25Model D50 PowerPAC Farm Duty 1-Phase Model DLC50Model D60 Engine Specifications Farm Duty 1-Phase Model DLC60Model D75 Engine Data Farm Duty 1-Phase Model DLC75Model D100 Model DLC100 Farm Duty 1-PhaseModel D130 Farm Duty 1-Phase Model DLC130 Electrical Connection Information Hard Wire Load Terminal BlockConnection Information Standby Permanent Mount Series Generator Generator Mounting RequirementsEngine Cooling Requirements Engine Cooling AIR Backpressure must not exceed 20 of water column HOT Exhaust GasesPage Generator END Cooling AIR Building VentilationBuilding Ventilation Exhaust Piping Exhaust RequirementsExhaust Thimble Minimum O.D Exhaust Piping Thru Walls and RoofsDouble Thimble Roof Outlet Details Control Panel Operation Function Page Page Operation Starting Operation Cranking Control LOW Voltage No VoltageOverheating Fluctuating VoltageHigh Voltage Mechanical Noise Generator Frame Produces Shock When TouchedTroubleshooting Engine Limited Warranty Warranty Period Limitations Current Distributor Information END User / Owner InformationRPM KVAPre Start-Up Check List Start-Up Procedure Oregon Street Oshkosh WI Phone 920-239-4200 Fax California Proposition 65 Warning Oregon Street Oshkosh WI Phone 920 236-4200 Fax 920