Intel SE7500CW2 manual Attaching the Label to the I/O Shield, Installing the I/O Shield

Page 51

Attaching the Label to the I/O Shield

1.Remove the backing from the label included with your server board.

2.Press the label onto the outside face of the I/O shield. See Figure 4, A.

USB 1 2 3 MOUSE KYBD

PA

 

RA

LLEL

 

A

10

NET

 

/100

MB

 

 

OM14360

Figure 4. Attaching the Label to the I/O Shield

Installing the I/O Shield

1. Position one edge so that the dotted groove is outside the chassis wall, and the lip of the shield rests on the inner chassis wall.

2. Hold the shield in place, and push it into the opening until it is seated. Make sure the I/O shield snaps into place all the way around.

1

2

OM14427

Figure 5. Installing the I/O Shield

Server Board Installation

51

Image 51
Contents Intel Server Board SE7500CW2 Product Guide Disclaimer Contents Upgrading Solving ProblemsTechnical Reference Regulatory and Integration InformationIndex Tables Description Server Board FeaturesServer Board Features FeatureSystem I/O Power Security Form Factor Back Panel Connectors Back Panel ConnectorsServer Board Connector and Component Locations Server Board Connector and Component LocationsProcessor Dual Processor OperationBoxed Processor Fan Heat sink MCH Intel E7500 ChipsetParallel Port Keyboard and Mouse ConnectorsSuper I/O Serial PortsPCI I/O Subsystem MemoryBit / 100 MHz PCI-X Capable Subsystem Bit / 133 MHz PCI-X Capable SubsystemVideo Controller Network Interface Controller NIC32-bit/33 MHz PCI Subsystem Wake on LAN AC Link ModePassword Protection SecuritySecurity Operation Summary Using Passwords Password Clear JumperIntel Server Board SE7500CW2 Product Guide Description and brief procedure Configuration Software and UtilitiesPower-On Self-Test Post Configuration UtilitiesSetup Menus Using Bios Setup UtilityIf You Cannot Access Setup Starting SetupPress Keyboard CommandsMenu Selection Bar Main Advanced Security Power Boot SystemMenu Selection Bar On-Screen OptionsChoices 44 MB, 3 ½ defaultMain Menu Main MenuPrimary/Secondary, Master/Slave Submenu Disabled defaultEnabled default Description Primary/Secondary, Master/Slave SubmenusWin2000/.NET Default Advanced MenuAdvanced Menu Enabled default Disabled default No defaultDOS default Auto Detect defaultO Device Configuration Submenu Device Configuration SubmenuECP default Default IRQ7 defaultDMA 3 default On Board Device Submenu On Board Device SubmenuPCI Configuration Submenu PCI Configuration SubmenuOption ROM Scan Submenu Choices Enabled defaultChoices Disabled default Server Menu SubmenuConsole Redirection Submenu Console Redirection SubmenuEnabled default No default Event Logging SubmenuEvent Logging Submenu Hardware Monitor Submenu Hardware Monitor SubmenuSecurity Menu If no password entered previously FeatureEnabled default User default Security MenuLast State default Power MenuBoot Menu Power MenuBoot Menu Boot PriorityDevice Feature Choices System MenuSystem Menu Port On Board Connector Designator Exit MenuExit Menu Obtaining the Upgrade Utility Upgrading the BiosPreparing for the Upgrade Recording the Current Bios SettingsUpgrading the Bios Recovering the BiosCreating the Bios Upgrade Diskette Changing the Bios Language Hardware Monitoring Monitored Headers and SensorsSensor Type Intel Server Board SE7500CW2 Product Guide Before You Begin Server Board InstallationSafety Cautions Tools and Supplies NeededSafety and Regulatory Compliance Processor Installation NotesPower Supply Minimum Hardware RequirementsInstallation Procedures Installing the I/O Gasket and ShieldAttaching the Gasket to the I/O Shield Attaching the Label to the I/O Shield Installing the I/O ShieldConfiguring Chassis Standoffs Configuring Chassis StandoffsInstalling Rubber Bumpers Installing Rubber BumpersInstalling the Server Board Placing the Server Board into the ChassisAttaching the Server Board Installing Memory Installing MemoryInstalling the Retention Brackets Installing the ProcessorsApplying Thermal Grease Attaching the ProcessorInstalling the Processor Wind Tunnel Attaching the Processor Wind Tunnel AssemblyAttaching the Heat Sink Attaching Intake and Exhaust Assemblies Attaching the Heat Sink FanInstalling the Optional Scsi Add-in Card Making Connections to the Server Board Making Connections to the Server BoardIDE Cables Cable RoutingRouting the Floppy Drive Cable Floppy Drive CableMaking Back Panel Connections Finishing UpUpgrading Memory Installing DIMMsProcessors Adding or Replacing a Processor Attaching the Processor Installing the Processor Wind Tunnel OM14477 Removing a Processor Replacing the Backup BatteryVarning Intel Server Board SE7500CW2 Product Guide Initial System Startup Solving ProblemsResetting the System ChecklistAfter the System Has Been Running Correctly Running New Application SoftwareMore Problem Solving Procedures Preparing the System for Diagnostic TestingMonitoring Post Confirming Loading of the Operating System Specific Problems and Corrective ActionsPower Light Does Not Light Verifying Proper Operation of Key System LightsCharacters Are Distorted or Incorrect No Characters Appear on ScreenDiskette Drive Activity Light Does Not Light System Cooling Fans Do Not Rotate ProperlyCannot Connect to a Server Problems with NetworkHard Disk Drive Activity Light Does Not Light CD-ROM Drive Activity Light Does Not LightProblems with Application Software Bootable CD-ROM Is Not DetectedPCI Installation Tips World Wide Web Telephone Getting HelpIntel Server Board SE7500CW2 Product Guide Jumper Name Configuration JumpersPins What happens at system reset Technical ReferenceLocation Pins DescriptionFront Panel Header Front Panel Header Connection DescriptionsProduct EMC Compliance Product Safety ComplianceRegulatory and Integration Information Product Regulatory ComplianceElectromagnetic Compatibility Notices Product Regulatory Compliance MarkingsProduct Certification Markings Taiwan Declaration of Conformity Europe CE Declaration of ConformityAustralia / New Zealand Korean RRL ComplianceESD IndexPCI
Related manuals
Manual 17 pages 57.58 Kb