Intel SE7500CW2 manual Cable Routing, IDE Cables

Page 62

Cable Routing

To ensure proper airflow within the chassis, follow the cable routing guidelines below.

If you purchased the optional SCSI hot-swap drive bay accessory, see the installation manual that shipped with the drive bay kit for information on SCSI cable routing.

IDE Cables

IDE cables that connect to devices in the lower device bays should be routed around the EPAC as shown below.

1.Remove the top half of the EPAC.

2.Route cables as shown in Figure 19.

3.Replace the top half of the EPAC.

B

A

OM14196

A.Ribbon Cable(s)

B.Lower Device Bay

Figure 19. Routing IDE Cables

62

Intel Server Board SE7500CW2 Product Guide

Image 62
Contents Intel Server Board SE7500CW2 Product Guide Disclaimer Contents Solving Problems UpgradingIndex Technical ReferenceRegulatory and Integration Information Tables Feature Server Board FeaturesServer Board Features DescriptionSystem I/O Power Security Form Factor Back Panel Connectors Back Panel ConnectorsServer Board Connector and Component Locations Server Board Connector and Component LocationsBoxed Processor Fan Heat sink ProcessorDual Processor Operation Intel E7500 Chipset MCHSerial Ports Keyboard and Mouse ConnectorsSuper I/O Parallel PortMemory PCI I/O SubsystemBit / 133 MHz PCI-X Capable Subsystem Bit / 100 MHz PCI-X Capable Subsystem32-bit/33 MHz PCI Subsystem Video ControllerNetwork Interface Controller NIC AC Link Mode Wake on LANSecurity Operation Summary Password ProtectionSecurity Password Clear Jumper Using PasswordsIntel Server Board SE7500CW2 Product Guide Configuration Utilities Configuration Software and UtilitiesPower-On Self-Test Post Description and brief procedureStarting Setup Using Bios Setup UtilityIf You Cannot Access Setup Setup MenusKeyboard Commands PressOn-Screen Options Power Boot SystemMenu Selection Bar Menu Selection Bar Main Advanced SecurityMain Menu 44 MB, 3 ½ defaultMain Menu ChoicesPrimary/Secondary, Master/Slave Submenus Disabled defaultEnabled default Description Primary/Secondary, Master/Slave SubmenuAdvanced Menu Win2000/.NET DefaultAdvanced Menu Auto Detect default Disabled default No defaultDOS default Enabled defaultDevice Configuration Submenu O Device Configuration SubmenuDMA 3 default ECP default DefaultIRQ7 default On Board Device Submenu On Board Device SubmenuPCI Configuration Submenu PCI Configuration SubmenuServer Menu Submenu Choices Enabled defaultChoices Disabled default Option ROM Scan SubmenuConsole Redirection Submenu Console Redirection SubmenuEvent Logging Submenu Enabled default No defaultEvent Logging Submenu Hardware Monitor Submenu Hardware Monitor SubmenuSecurity Menu If no password entered previously FeatureEnabled default User default Security MenuPower Menu Power MenuBoot Menu Last State defaultDevice Boot MenuBoot Priority System Menu Feature ChoicesSystem Menu Exit Menu Port On Board Connector DesignatorExit Menu Recording the Current Bios Settings Upgrading the BiosPreparing for the Upgrade Obtaining the Upgrade UtilityCreating the Bios Upgrade Diskette Upgrading the BiosRecovering the Bios Changing the Bios Language Sensor Type Hardware MonitoringMonitored Headers and Sensors Intel Server Board SE7500CW2 Product Guide Tools and Supplies Needed Server Board InstallationSafety Cautions Before You BeginSafety and Regulatory Compliance Minimum Hardware Requirements Installation NotesPower Supply ProcessorAttaching the Gasket to the I/O Shield Installation ProceduresInstalling the I/O Gasket and Shield Installing the I/O Shield Attaching the Label to the I/O ShieldConfiguring Chassis Standoffs Configuring Chassis StandoffsInstalling Rubber Bumpers Installing Rubber BumpersAttaching the Server Board Installing the Server BoardPlacing the Server Board into the Chassis Installing Memory Installing MemoryInstalling the Processors Installing the Retention BracketsAttaching the Processor Applying Thermal GreaseAttaching the Heat Sink Installing the Processor Wind TunnelAttaching the Processor Wind Tunnel Assembly Attaching the Heat Sink Fan Attaching Intake and Exhaust AssembliesInstalling the Optional Scsi Add-in Card Making Connections to the Server Board Making Connections to the Server BoardCable Routing IDE CablesFloppy Drive Cable Routing the Floppy Drive CableFinishing Up Making Back Panel ConnectionsUpgrading Installing DIMMs MemoryProcessors Adding or Replacing a Processor Attaching the Processor Installing the Processor Wind Tunnel OM14477 Replacing the Backup Battery Removing a ProcessorVarning Intel Server Board SE7500CW2 Product Guide Checklist Solving ProblemsResetting the System Initial System StartupRunning New Application Software After the System Has Been Running CorrectlyMonitoring Post More Problem Solving ProceduresPreparing the System for Diagnostic Testing Verifying Proper Operation of Key System Lights Specific Problems and Corrective ActionsPower Light Does Not Light Confirming Loading of the Operating SystemNo Characters Appear on Screen Characters Are Distorted or IncorrectSystem Cooling Fans Do Not Rotate Properly Diskette Drive Activity Light Does Not LightCD-ROM Drive Activity Light Does Not Light Problems with NetworkHard Disk Drive Activity Light Does Not Light Cannot Connect to a ServerPCI Installation Tips Problems with Application SoftwareBootable CD-ROM Is Not Detected Getting Help World Wide Web TelephoneIntel Server Board SE7500CW2 Product Guide Technical Reference Configuration JumpersPins What happens at system reset Jumper NameFront Panel Header Connection Descriptions Pins DescriptionFront Panel Header LocationProduct Regulatory Compliance Product Safety ComplianceRegulatory and Integration Information Product EMC ComplianceProduct Certification Markings Electromagnetic Compatibility NoticesProduct Regulatory Compliance Markings Europe CE Declaration of Conformity Taiwan Declaration of ConformityKorean RRL Compliance Australia / New ZealandIndex ESDPCI
Related manuals
Manual 17 pages 57.58 Kb