Intel SE7500CW2 manual Installing the Processors, Installing the Retention Brackets

Page 56

Installing the Processor(s)

CAUTION

If you are installing only one processor, it must be installed in the Primary

Processor Socket, which is the closest to the corner of the server board.

If you are installing a second processor to your system, you must verify that the second processor is identical to the first processor, same voltage and speed. Using unidentical processors could cause system failure.

Installing the Retention Brackets

1.Observe the safety and ESD precautions at the beginning of this chapter and the additional precautions given here.

2.Remove power from your system by unplugging the AC power cord.

3.Remove the chassis cover (see your system or chassis documentation for instructions).

4.When installing a processor, insert the retention brackets and tighten the four retention screws.

OM14471

Figure 11. Installing the Retention Brackets

56

Intel Server Board SE7500CW2 Product Guide

Image 56
Contents Intel Server Board SE7500CW2 Product Guide Disclaimer Contents Solving Problems UpgradingIndex Technical ReferenceRegulatory and Integration Information Tables Server Board Features Server Board FeaturesFeature DescriptionSystem I/O Power Security Form Factor Back Panel Connectors Back Panel ConnectorsServer Board Connector and Component Locations Server Board Connector and Component LocationsBoxed Processor Fan Heat sink ProcessorDual Processor Operation Intel E7500 Chipset MCHKeyboard and Mouse Connectors Super I/OSerial Ports Parallel PortMemory PCI I/O SubsystemBit / 133 MHz PCI-X Capable Subsystem Bit / 100 MHz PCI-X Capable Subsystem32-bit/33 MHz PCI Subsystem Video ControllerNetwork Interface Controller NIC AC Link Mode Wake on LANSecurity Operation Summary Password ProtectionSecurity Password Clear Jumper Using PasswordsIntel Server Board SE7500CW2 Product Guide Configuration Software and Utilities Power-On Self-Test PostConfiguration Utilities Description and brief procedureUsing Bios Setup Utility If You Cannot Access SetupStarting Setup Setup MenusKeyboard Commands PressPower Boot System Menu Selection BarOn-Screen Options Menu Selection Bar Main Advanced Security44 MB, 3 ½ default Main MenuMain Menu ChoicesDisabled default Enabled default DescriptionPrimary/Secondary, Master/Slave Submenus Primary/Secondary, Master/Slave SubmenuAdvanced Menu Win2000/.NET DefaultAdvanced Menu Disabled default No default DOS defaultAuto Detect default Enabled defaultDevice Configuration Submenu O Device Configuration SubmenuDMA 3 default ECP default DefaultIRQ7 default On Board Device Submenu On Board Device SubmenuPCI Configuration Submenu PCI Configuration SubmenuChoices Enabled default Choices Disabled defaultServer Menu Submenu Option ROM Scan SubmenuConsole Redirection Submenu Console Redirection SubmenuEvent Logging Submenu Enabled default No defaultEvent Logging Submenu Hardware Monitor Submenu Hardware Monitor SubmenuIf no password entered previously Feature Enabled default User defaultSecurity Menu Security MenuPower Menu Boot MenuPower Menu Last State defaultDevice Boot MenuBoot Priority System Menu Feature ChoicesSystem Menu Exit Menu Port On Board Connector DesignatorExit Menu Upgrading the Bios Preparing for the UpgradeRecording the Current Bios Settings Obtaining the Upgrade UtilityCreating the Bios Upgrade Diskette Upgrading the BiosRecovering the Bios Changing the Bios Language Sensor Type Hardware MonitoringMonitored Headers and Sensors Intel Server Board SE7500CW2 Product Guide Server Board Installation Safety CautionsTools and Supplies Needed Before You BeginSafety and Regulatory Compliance Installation Notes Power SupplyMinimum Hardware Requirements ProcessorAttaching the Gasket to the I/O Shield Installation ProceduresInstalling the I/O Gasket and Shield Installing the I/O Shield Attaching the Label to the I/O ShieldConfiguring Chassis Standoffs Configuring Chassis StandoffsInstalling Rubber Bumpers Installing Rubber BumpersAttaching the Server Board Installing the Server BoardPlacing the Server Board into the Chassis Installing Memory Installing MemoryInstalling the Processors Installing the Retention BracketsAttaching the Processor Applying Thermal GreaseAttaching the Heat Sink Installing the Processor Wind TunnelAttaching the Processor Wind Tunnel Assembly Attaching the Heat Sink Fan Attaching Intake and Exhaust AssembliesInstalling the Optional Scsi Add-in Card Making Connections to the Server Board Making Connections to the Server BoardCable Routing IDE CablesFloppy Drive Cable Routing the Floppy Drive CableFinishing Up Making Back Panel ConnectionsUpgrading Installing DIMMs MemoryProcessors Adding or Replacing a Processor Attaching the Processor Installing the Processor Wind Tunnel OM14477 Replacing the Backup Battery Removing a ProcessorVarning Intel Server Board SE7500CW2 Product Guide Solving Problems Resetting the SystemChecklist Initial System StartupRunning New Application Software After the System Has Been Running CorrectlyMonitoring Post More Problem Solving ProceduresPreparing the System for Diagnostic Testing Specific Problems and Corrective Actions Power Light Does Not LightVerifying Proper Operation of Key System Lights Confirming Loading of the Operating SystemNo Characters Appear on Screen Characters Are Distorted or IncorrectSystem Cooling Fans Do Not Rotate Properly Diskette Drive Activity Light Does Not LightProblems with Network Hard Disk Drive Activity Light Does Not LightCD-ROM Drive Activity Light Does Not Light Cannot Connect to a ServerPCI Installation Tips Problems with Application SoftwareBootable CD-ROM Is Not Detected Getting Help World Wide Web TelephoneIntel Server Board SE7500CW2 Product Guide Configuration Jumpers Pins What happens at system resetTechnical Reference Jumper NamePins Description Front Panel HeaderFront Panel Header Connection Descriptions LocationProduct Safety Compliance Regulatory and Integration InformationProduct Regulatory Compliance Product EMC ComplianceProduct Certification Markings Electromagnetic Compatibility NoticesProduct Regulatory Compliance Markings Europe CE Declaration of Conformity Taiwan Declaration of ConformityKorean RRL Compliance Australia / New ZealandIndex ESDPCI
Related manuals
Manual 17 pages 57.58 Kb