Intel SE7500CW2 manual Attaching the Processor, Applying Thermal Grease

Page 57

Attaching the Processor

NOTE

This server board has “zero-insertion-force” sockets. If the processor does not drop easily into the socket holes, make sure the lever is in the full upright position and the processor is oriented properly.

1. Lift the socket lever on the processor.

A

B

OM14473

Figure 12. Opening Socket Lever and Attaching Processor

2.Align the Alignment Triangle Mark (Figure 12, A) on the processor with the Alignment Triangle Cutout on the socket (Figure 12, B).

3.Insert the processor in the socket and close the socket lever.

Applying Thermal Grease

Apply thermal grease to the processor as shown in Figure 13.

OM14472

Figure 13. Applying Thermal Grease

Server Board Installation

57

Image 57
Contents Intel Server Board SE7500CW2 Product Guide Disclaimer Contents Upgrading Solving ProblemsTechnical Reference Regulatory and Integration InformationIndex Tables Server Board Features Server Board FeaturesFeature DescriptionSystem I/O Power Security Form Factor Back Panel Connectors Back Panel ConnectorsServer Board Connector and Component Locations Server Board Connector and Component LocationsProcessor Dual Processor OperationBoxed Processor Fan Heat sink MCH Intel E7500 ChipsetSuper I/O Keyboard and Mouse ConnectorsSerial Ports Parallel PortPCI I/O Subsystem MemoryBit / 100 MHz PCI-X Capable Subsystem Bit / 133 MHz PCI-X Capable SubsystemVideo Controller Network Interface Controller NIC32-bit/33 MHz PCI Subsystem Wake on LAN AC Link ModePassword Protection SecuritySecurity Operation Summary Using Passwords Password Clear JumperIntel Server Board SE7500CW2 Product Guide Power-On Self-Test Post Configuration Software and UtilitiesConfiguration Utilities Description and brief procedureIf You Cannot Access Setup Using Bios Setup UtilityStarting Setup Setup MenusPress Keyboard CommandsMenu Selection Bar Power Boot SystemOn-Screen Options Menu Selection Bar Main Advanced SecurityMain Menu 44 MB, 3 ½ defaultMain Menu ChoicesEnabled default Description Disabled defaultPrimary/Secondary, Master/Slave Submenus Primary/Secondary, Master/Slave SubmenuWin2000/.NET Default Advanced MenuAdvanced Menu DOS default Disabled default No defaultAuto Detect default Enabled defaultO Device Configuration Submenu Device Configuration SubmenuECP default Default IRQ7 defaultDMA 3 default On Board Device Submenu On Board Device SubmenuPCI Configuration Submenu PCI Configuration SubmenuChoices Disabled default Choices Enabled defaultServer Menu Submenu Option ROM Scan SubmenuConsole Redirection Submenu Console Redirection SubmenuEnabled default No default Event Logging SubmenuEvent Logging Submenu Hardware Monitor Submenu Hardware Monitor SubmenuEnabled default User default If no password entered previously FeatureSecurity Menu Security MenuBoot Menu Power MenuPower Menu Last State defaultBoot Menu Boot PriorityDevice Feature Choices System MenuSystem Menu Port On Board Connector Designator Exit MenuExit Menu Preparing for the Upgrade Upgrading the BiosRecording the Current Bios Settings Obtaining the Upgrade UtilityUpgrading the Bios Recovering the BiosCreating the Bios Upgrade Diskette Changing the Bios Language Hardware Monitoring Monitored Headers and SensorsSensor Type Intel Server Board SE7500CW2 Product Guide Safety Cautions Server Board InstallationTools and Supplies Needed Before You BeginSafety and Regulatory Compliance Power Supply Installation NotesMinimum Hardware Requirements ProcessorInstallation Procedures Installing the I/O Gasket and ShieldAttaching the Gasket to the I/O Shield Attaching the Label to the I/O Shield Installing the I/O ShieldConfiguring Chassis Standoffs Configuring Chassis StandoffsInstalling Rubber Bumpers Installing Rubber BumpersInstalling the Server Board Placing the Server Board into the ChassisAttaching the Server Board Installing Memory Installing MemoryInstalling the Retention Brackets Installing the ProcessorsApplying Thermal Grease Attaching the ProcessorInstalling the Processor Wind Tunnel Attaching the Processor Wind Tunnel AssemblyAttaching the Heat Sink Attaching Intake and Exhaust Assemblies Attaching the Heat Sink FanInstalling the Optional Scsi Add-in Card Making Connections to the Server Board Making Connections to the Server BoardIDE Cables Cable RoutingRouting the Floppy Drive Cable Floppy Drive CableMaking Back Panel Connections Finishing UpUpgrading Memory Installing DIMMsProcessors Adding or Replacing a Processor Attaching the Processor Installing the Processor Wind Tunnel OM14477 Removing a Processor Replacing the Backup BatteryVarning Intel Server Board SE7500CW2 Product Guide Resetting the System Solving ProblemsChecklist Initial System StartupAfter the System Has Been Running Correctly Running New Application SoftwareMore Problem Solving Procedures Preparing the System for Diagnostic TestingMonitoring Post Power Light Does Not Light Specific Problems and Corrective ActionsVerifying Proper Operation of Key System Lights Confirming Loading of the Operating SystemCharacters Are Distorted or Incorrect No Characters Appear on ScreenDiskette Drive Activity Light Does Not Light System Cooling Fans Do Not Rotate ProperlyHard Disk Drive Activity Light Does Not Light Problems with NetworkCD-ROM Drive Activity Light Does Not Light Cannot Connect to a ServerProblems with Application Software Bootable CD-ROM Is Not DetectedPCI Installation Tips World Wide Web Telephone Getting HelpIntel Server Board SE7500CW2 Product Guide Pins What happens at system reset Configuration JumpersTechnical Reference Jumper NameFront Panel Header Pins DescriptionFront Panel Header Connection Descriptions LocationRegulatory and Integration Information Product Safety ComplianceProduct Regulatory Compliance Product EMC ComplianceElectromagnetic Compatibility Notices Product Regulatory Compliance MarkingsProduct Certification Markings Taiwan Declaration of Conformity Europe CE Declaration of ConformityAustralia / New Zealand Korean RRL ComplianceESD IndexPCI
Related manuals
Manual 17 pages 57.58 Kb