Installation | Health Care System III |
6)Remove the ramp that is located under the unit and place it against the front of the skid. With one person holding the left side of the unit, and one person holding the right side of the unit, roll and guide the unit off the skid and down the ramp.
7)We recommend that you store all the packing material specifically designed for this unit, in case the need should arise to transport the system to another location.
The HCS III consists of the following items:
•Main cart
•Mobile camera cart (optional)
•Headset and jack
The utility drawer on the main cart contains the following:
•Microphone
•Remote control
•Batteries
•User manuals
•Short video cable
•
Connecting the System
The following block diagram provides an overview of the cabling connections that are required for the main HCS III cart and optional equipment. Before installing the system’s cables and components, make sure that the cart’s main power plug is unplugged from any power source.
20