Sterling SVL-B, SVL-A, SVL-C, SVL-D installation instructions

Page 13

Sight Glass Mounting Flange

SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 13 of 49

Image 13
Contents SVL-A, SVL-B, SVL-C, & SVL-D Operation and Installation InstructionsPage Unpacking and Inspection Shipping InformationTable of Contents Technical Data How to Use This Manual Safety InstructionsExplanations and Information How to Use This Manual For Your SafetyMaintenance Responsibility Unit Safety General Information InstallationOror Not to scale Installing the Material ReceiverPage SF-1 Feeder To Digital Dosing FeederAssembly Installing the Control AssemblyShop Air 10 Venturi Assembly Connecting the Compressed Air SupplyPerformance Connecting Material LinesTo Install the Ratio Option SVL-C Two inlet InstallationElectrical Connection Operational Summary Functional DescriptionMethod of Functioning Venturi AssemblyControl and Regulator Unit Control AssemblyAdjusting Compressed Air Flow SetupPreparations Setting the Mixing Ratio of the Components SVL-C Units Mounting Basic Setting of the Filling Level in the Conveyor HopperElectrical Connection OperationProgramming Empty adjustmentLocking Full adjustmentUnlocking Error messagesSet-up / Operation Maintenance Intervals MaintenanceDaily Weekly Every 3 months Pertaining to the use of compressed air Cleaning the Conveying FilterSVL-A Cleaning the Compressed Air FilterDisassembly Adjusting the Level ProbeRemedy See Test Steps Below TroubleshootingPage Technical Data SVL-A Dimension SheetSVL-B SVL-C SVL-D Spare Parts Lists SVL-B SVL-C Control Assembly Wand Assembly 10 Take-Off Wand Assembly Quick Start Guide -SVL Self Contained Material Loader Parts Department Technical Assistance