Sterling SVL-A, SVL-B, SVL-C, SVL-D installation instructions Table of Contents

Page 4

Table of Contents

Chapter 1: Safety Instructions

6

1-1 How to Use This Manual

6

 

Safety Symbols Used in this Manual

6

1-2

Explanations and Information

7

1-3

For Your Safety

8

 

How to Use This Manual

8

 

Warnings and Precautions

8

 

Maintenance Responsibility

9

1-4

Unit Safety

9

Chapter 2: Installation

10

2-1

General Information

10

2-2 Installing the Material Receiver

10

2-3 Installing the Control Assembly

10

2-4 Connecting the Compressed Air Supply

10

2-5

Connecting Material Lines

10

2-6

Electrical Connection

10

CHAPTER 3: FUNCTIONAL DESCRIPTION

10

3-1

Operational Summary

10

3-2

Method of Functioning

10

3-3

Control Assembly

10

CHAPTER 4: SETUP

10

4-1

Preparations

10

4-2 Adjusting Compressed Air Flow

10

4-3 Setting the Mixing Ratio of the Components (SVL-C Units)

10

4-4 Basic Setting of the Filling Level in the Conveyor Hopper

10

CHAPTER 5: MAINTENANCE

10

Preparations

10

5-1

Maintenance Intervals

10

5-2 Cleaning the Conveying Filter

10

5-3 Cleaning the Compressed Air Filter

10

 

Disassembly

10

 

Assembly

10

5-4 Adjusting the Level Probe

10

5-4

Troubleshooting

10

SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 4 of 49

Image 4
Contents Operation and Installation Instructions SVL-A, SVL-B, SVL-C, & SVL-DPage Shipping Information Unpacking and InspectionTable of Contents Technical Data Safety Instructions How to Use This ManualExplanations and Information For Your Safety How to Use This ManualUnit Safety Maintenance ResponsibilityInstallation General InformationOror Installing the Material Receiver Not to scalePage To Digital Dosing Feeder SF-1 FeederAssembly Installing the Control AssemblyShop Air Connecting the Compressed Air Supply 10 Venturi AssemblyConnecting Material Lines PerformanceSVL-C Two inlet Installation To Install the Ratio OptionElectrical Connection Functional Description Operational SummaryVenturi Assembly Method of FunctioningControl Assembly Control and Regulator UnitAdjusting Compressed Air Flow SetupPreparations Setting the Mixing Ratio of the Components SVL-C Units Basic Setting of the Filling Level in the Conveyor Hopper MountingElectrical Connection OperationEmpty adjustment ProgrammingFull adjustment LockingError messages UnlockingSet-up / Operation Maintenance Intervals MaintenanceDaily Weekly Every 3 months Cleaning the Conveying Filter Pertaining to the use of compressed airCleaning the Compressed Air Filter SVL-AAdjusting the Level Probe DisassemblyTroubleshooting Remedy See Test Steps BelowPage Technical Data Dimension Sheet SVL-ASVL-B SVL-C SVL-D Spare Parts Lists SVL-B SVL-C Control Assembly Wand Assembly 10 Take-Off Wand Assembly Quick Start Guide -SVL Self Contained Material Loader Technical Assistance Parts Department