Sterling SVL-D, SVL-A, SVL-B, SVL-C installation instructions Oror

Page 11

Figure 2.2: SVL-B Parts

OR

Shown with optional sight glass assembly

Figure 2.3: SVL-C Parts

OROR

Shown with optional sight glass assembly

SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 11 of 49

Image 11
Contents SVL-A, SVL-B, SVL-C, & SVL-D Operation and Installation InstructionsPage Unpacking and Inspection Shipping InformationTable of Contents Technical Data How to Use This Manual Safety InstructionsExplanations and Information How to Use This Manual For Your SafetyMaintenance Responsibility Unit SafetyGeneral Information InstallationOror Not to scale Installing the Material ReceiverPage SF-1 Feeder To Digital Dosing FeederShop Air Installing the Control AssemblyAssembly 10 Venturi Assembly Connecting the Compressed Air SupplyPerformance Connecting Material LinesTo Install the Ratio Option SVL-C Two inlet InstallationElectrical Connection Operational Summary Functional DescriptionMethod of Functioning Venturi AssemblyControl and Regulator Unit Control AssemblyPreparations SetupAdjusting Compressed Air Flow Setting the Mixing Ratio of the Components SVL-C Units Operation Basic Setting of the Filling Level in the Conveyor HopperMounting Electrical ConnectionProgramming Empty adjustmentLocking Full adjustmentUnlocking Error messagesSet-up / Operation Daily Weekly Every 3 months MaintenanceMaintenance Intervals Pertaining to the use of compressed air Cleaning the Conveying FilterSVL-A Cleaning the Compressed Air FilterDisassembly Adjusting the Level ProbeRemedy See Test Steps Below TroubleshootingPage Technical Data SVL-A Dimension SheetSVL-B SVL-C SVL-D Spare Parts Lists SVL-B SVL-C Control Assembly Wand Assembly 10 Take-Off Wand Assembly Quick Start Guide -SVL Self Contained Material Loader Parts Department Technical Assistance