2-4 Connecting the Compressed Air Supply

Before connecting the compressed air supply, check the following:

Check compressed air piping for correct installation and assembly.

Check the fittings, length and quality of the hose connections for agreement with requirements.

Check all compressed air lines for leakages.

Supply clean, dry (non-lubricated) compressed air with 70-90 psi (5-6 bar) system pressure.

The air should be free of oil and water.

1.Find the compressed air hose, which has been supplied.

2.Connect it to the venturi and control assembly.

3.Firmly press the compressed-air hose into each connecting socket.

4.Connect the control assembly to the compressed air supply.

5.Set the pressure on the pressure reducer at 70-90 psi (5-6 bar).

Note: Unit requires 25 SCFM at 80 psig if continuously run. Typical air consumption is 8-10 scfm at 80 psig. Max. input pressure 145 psi (10 bar).

WARNING! Make sure that the PLANT supply air lines are large enough to provide required air flow and line pressure. Failure to provide adequate air flow and line pressure will result in conveying performance issues.

Figure 2.10: Venturi Assembly

SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style 16 of 49

Image 16
Contents Operation and Installation Instructions SVL-A, SVL-B, SVL-C, & SVL-DPage Shipping Information Unpacking and InspectionTable of Contents Technical Data Safety Instructions How to Use This ManualExplanations and Information For Your Safety How to Use This ManualUnit Safety Maintenance ResponsibilityInstallation General InformationOror Installing the Material Receiver Not to scalePage To Digital Dosing Feeder SF-1 FeederAssembly Installing the Control AssemblyShop Air Connecting the Compressed Air Supply 10 Venturi AssemblyConnecting Material Lines PerformanceSVL-C Two inlet Installation To Install the Ratio OptionElectrical Connection Functional Description Operational SummaryVenturi Assembly Method of FunctioningControl Assembly Control and Regulator UnitAdjusting Compressed Air Flow SetupPreparations Setting the Mixing Ratio of the Components SVL-C Units Basic Setting of the Filling Level in the Conveyor Hopper MountingElectrical Connection OperationEmpty adjustment ProgrammingFull adjustment LockingError messages UnlockingSet-up / Operation Maintenance Intervals MaintenanceDaily Weekly Every 3 months Cleaning the Conveying Filter Pertaining to the use of compressed airCleaning the Compressed Air Filter SVL-AAdjusting the Level Probe DisassemblyTroubleshooting Remedy See Test Steps BelowPage Technical Data Dimension Sheet SVL-ASVL-B SVL-C SVL-D Spare Parts Lists SVL-B SVL-C Control Assembly Wand Assembly 10 Take-Off Wand Assembly Quick Start Guide -SVL Self Contained Material Loader Technical Assistance Parts Department